Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Bakha

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Bakha

Bathroom waterproofing before tiling in Bakha starts with WhatsApp and photos of the floor and walls. The location is surrounded by small rural plots, and bathrooms need complete water protection before tiles are laid.

Houses in Bakha are scattered across small plots in various sizes, with bathrooms reflecting differences in age and design. The floor must be covered with a continuous waterproof membrane reaching all corners, joints and openings. Concrete and brick walls wetted by water and steam need full protection before tiles are bonded. Photos show the condition of each surface and any past moisture damage, helping us choose the right waterproofing method.

  • Bakha is a small hamlet in the Eastern Province, near Maghati, Hanidh and Al Hulaysiyah, with scattered small houses.
  • A simple bathroom in a rural setting may be older, so checking with photos is important to assess surface condition before waterproofing.
What the service includes

What we do for you in Bakha

  • Applying the membrane over the full floor and up the walls in the wet zone
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Forming and treating the floor-to-wall corners before the main layer
How we work

From first contact to the finished job in Bakha

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Start from Bakha with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Your request from Bakha comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing before tiling in Bakha

Is pre-tiling waterproofing enough for older bathrooms in Bakha?

If the concrete and brick are sound, yes. But if severely damaged by past leaks, repairs may be needed first. Photos reveal this.

How many waterproofing layers go on before tiling?

This depends on the surface condition and materials used. Photos help us decide how many layers and what thickness will ensure full protection.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

How do I request bathroom waterproofing before tiling in Bakha?

Call us, or send clear photos of the spot and its location in Bakha on WhatsApp, and we will work out the next step with you.

Nearby areas

The same service in nearby areas

If the site is outside Bakha, the same service is available in Maghati, Hanidh and Al Hulaysiyah.

Other services in the area

More services in Bakha

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Bakha?
Call us now

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp