Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Maghati

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Maghati

Bathroom waterproofing before tiling in Maghati begins with photos of the floor and walls sent by call or WhatsApp. The village has various houses and villas, and bathrooms need water protection before tiles are laid.

Maghati is a small village with houses and villas of varying size and construction. Bathrooms differ in design and materials used, some old and others new. Floors may be concrete or prepared for tiling, and wet walls need protection from moisture. Water seeps from washing and drainage through cracks and joints, causing wall damp and deterioration. A waterproof membrane is applied to the entire surface before tiles to form a continuous barrier. Photos show the bathroom's condition and help select the best waterproofing method.

  • Maghati is a village in the Eastern Province, near Bakha, Hanidh and Al Hulaysiyah, with houses and villas.
  • In a house with one or more bathrooms, each must be waterproofed before tiling.
What the service includes

The bathroom waterproofing before tiling work in Maghati

  • Applying the membrane over the full floor and up the walls in the wet zone
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Forming and treating the floor-to-wall corners before the main layer
How we work

The stages of the work in Maghati

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Maghati is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Maghati comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing before tiling in Maghati

How much time does waterproofing a bathroom take before tiling in Maghati?

The time depends on the bathroom size and surface condition. After the waterproof membrane is applied, it must dry before tiling. Send photos of the bathroom and we will tell you about the process.

Does bathroom waterproofing protect against damp coming from outside the house?

Bathroom waterproofing protects against water from washing and drainage inside the bathroom. To protect the house from external damp, the foundation and outer walls need separate waterproofing services.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

How do I request bathroom waterproofing before tiling in Maghati?

Call us, or send clear photos of the spot and its location in Maghati on WhatsApp, and we will work out the next step with you.

Nearby areas

Areas near Maghati

Nearby areas we also cover: Bakha, Hanidh and Al Hulaysiyah.

Other services in the area

More services in Maghati

Worker applying the white insulation layer on a villa roof by the sea

In Maghati and need bathroom waterproofing before tiling?
Send us photos of the spot

Describe the problem and where it is in Maghati, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp