Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Hulaysiyah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Hulaysiyah

Bitumen bathroom waterproofing in Al Hulaysiyah begins with WhatsApp photos of the floor and lower walls. The village has scattered houses and villas across wide plots, and each bathroom needs protection before tiling and screed are laid.

Homes in the village are scattered, and bathroom sizes and layouts vary widely. A bathroom may be newly built or older, and in both cases the floor and walls must be waterproofed before screed is poured and tiles laid. Moisture seeps through fine cracks and joints if the waterproofing is not applied on time. Photos of the bathroom, the concrete condition and the pipes help select the right method.

  • Al Hulaysiyah is a village in the Eastern Province, near Hanidh and Maghati, with houses and villas spread across wide plots.
  • In the village, bathroom waterproofing must be applied before the concrete screed and plaster go down.
What the service includes

What we do for you in Al Hulaysiyah

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Checking the concrete floor and wall bases and identifying cracks
  • Applying bitumen layers over the floor including the shower area
  • Closing the waterproofing around drain openings and pipe entries
How we work

How we carry out bitumen bathroom waterproofing in Al Hulaysiyah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

We serve Al Hulaysiyah and around itIncluding Hanidh, Maghati and Bakha, as part of our work across the Eastern Province.

Bitumen bathroom waterproofing in Al HulaysiyahWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Al Hulaysiyah

Can an old bathroom in Al Hulaysiyah be waterproofed after removing old tiles?

Yes, once the old tiles and screed are removed and the concrete is exposed. We check the concrete from photos, treat cracks and damp, then waterproof the surface before new screed and tiles are laid.

What is the difference between waterproofing a new and an old bathroom?

A new bathroom is waterproofed just before screed is poured, while an old one needs tiles and screed removed first and any cracks or damp treated in the concrete. Photos show the condition and the steps required.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Do you offer bitumen bathroom waterproofing in Al Hulaysiyah?

Yes. Al Hulaysiyah is within our service area in the Eastern Province, and we also work in Hanidh, Maghati and Bakha. Call us or send photos of the spot on WhatsApp.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

Bitumen bathroom waterproofing near Al Hulaysiyah

If the site is outside Al Hulaysiyah, the same service is available in Hanidh, Maghati and Bakha.

Other services in the area

More services in Al Hulaysiyah

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Al Hulaysiyah?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp