Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Badiah Al Basri

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Badiah Al Basri

We offer bitumen bathroom waterproofing in Badiah Al Basri, Al-Ahsa, starting with photos of the floor and wall bases sent by call or WhatsApp. Bitumen is laid before the screed and tiles so water cannot reach the layers beneath.

The neighbourhood is made up of mid-sized homes and villas on grid-like streets, and its bathrooms range from recently built to altered over time. Trouble usually starts at the corner where wall meets floor, or around the drain outlet, which needs particular care. The photos will show whether the existing floor can take a new layer or whether partial removal is required.

  • Badiah Al Basri is a residential district in Al-Ahsa in the Eastern Province, lying close to Qatif, Ash Shariah and Al Qalah.
  • The drain outlet deserves special attention, since its junction with the floor can leak after years of use.
What the service includes

The bitumen bathroom waterproofing work in Badiah Al Basri

  • Closing the waterproofing around drain openings and pipe entries
  • Checking the concrete floor and wall bases and identifying cracks
  • Applying bitumen layers over the floor including the shower area
  • Confirming full drying before the screed is poured
How we work

How we carry out bitumen bathroom waterproofing in Badiah Al Basri

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

We serve Badiah Al Basri and around itIncluding Qatif, Ash Shariah and Al Qalah, as part of our work across the Eastern Province.

Your request from Badiah Al Basri comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in Badiah Al Basri

Is bitumen applied around the drain outlet in Badiah Al Basri?

Yes, the lining covers the drain area because it is among the spots most exposed to leaks; the photos will show how its junction with the floor is treated.

How long must a Badiah Al Basri bathroom wait after bitumen before tiling?

The bitumen must dry completely before the screed and tiles go on; the waiting time varies with the weather and the amount applied, and we will explain it after the inspection.

How do I request bitumen bathroom waterproofing in Badiah Al Basri?

Call us, or send clear photos of the spot and its location in Badiah Al Basri on WhatsApp, and we will work out the next step with you.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

We also offer it in neighbouring areas

If the site is outside Badiah Al Basri, the same service is available in Qatif, Ash Shariah and Al Qalah.

Other services in the area

More services in Badiah Al Basri

Pool at night with water jets after waterproofing

In Badiah Al Basri and need bitumen bathroom waterproofing?
Send us photos of the spot

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp