Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Qalah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Qalah

Bitumen waterproofing for bathrooms in Al Qalah starts with photos you send by WhatsApp or call of the bathroom floor and walls before screed and tiling. The district has older blocks and newer villas, each with bathrooms needing reliable protection from water leakage.

Al Qalah has older blocks alongside newer villas, and bathrooms in these homes vary widely in type and condition. Older blocks may have small bathrooms with varied floor materials, while new villas may have larger bathrooms on stronger foundations. Bitumen forms a strong waterproof layer beneath the new floor and lower walls, preventing water from seeping into the foundation, neighbouring walls and lower floors. Photos show the surface type and existing moisture before waterproofing starts.

  • Al Qalah is a district in the Eastern Province near Ash Shamasiyyah, Bab Madinah Ash Shamal and Qatif, containing residential blocks and villas side by side.
  • A bathroom in an older block may sit on a high moisture layer, making bitumen necessary before any new construction.
What the service includes

What the service covers in Al Qalah

  • Confirming full drying before the screed is poured
  • Applying bitumen layers over the floor including the shower area
  • Closing the waterproofing around drain openings and pipe entries
  • Checking the concrete floor and wall bases and identifying cracks
How we work

This is how we work in Al Qalah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Start from Al Qalah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve Al Qalah and around itIncluding Ash Shamasiyyah, Bab Madinah Ash Shamal and Qatif, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in Al Qalah

Is bitumen alone enough or do we need another layer over it?

Bitumen is a base layer in the protection system. Above it come the screed and tiles. The quality of the screed and tiles and how well the ceramic and grout seal the joints also matter for protecting the bathroom from moisture.

What if the old bathroom is wet before applying bitumen?

The surface must be dried first. If the moisture comes from an active leak, its source must be repaired. The photos you send help us identify the cause, and we may advise you to do extra work before the bitumen.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

What should I send you from Al Qalah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Qalah, and we will work out the next step with you.

Nearby areas

The same service in nearby areas

If the site is outside Al Qalah, the same service is available in Ash Shamasiyyah, Bab Madinah Ash Shamal and Qatif.

Other services in the area

More services in Al Qalah

Pool at night with water jets after waterproofing

Your first step in Al Qalah:
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp