
Bathroom waterproofing before tiling in Badiah Al Basri
We fit bathroom waterproofing before tiling in Badiah Al Basri, Hofuf, with a continuous membrane on the floor and wet walls before adhesive and tiles go on. We serve Badiah Al Basri and the Eastern Province, starting from photos of the bathroom sent by call or WhatsApp.
Badiah Al Basri is a residential district of houses and small compounds, and many of its bathrooms were tiled over fairly old concrete floors. Over the years the joint between floor and wall opens up, and moisture builds at shower corners and around drain openings. Photos help separate a surface fault in the tiles from a problem in the base beneath them.
- Badiah Al Basri is a residential district in Al-Ahsa in the Eastern Province, close to Qatif, Ash Shariah and Al Qalah.
- The part of a bathroom most exposed to damp is the joint between floor and wall, which moves as the building expands and contracts.
What we do for you in Badiah Al Basri
- Checking the floor, the render, the corners, the drain outlet and pipe sleeves
- Leaving the membrane to dry and cure before adhesive and tiling begin
- Applying the membrane over the full floor and up the walls in the wet zone
- Cleaning the surface, removing loose parts and treating hairline cracks
This is how we work in Badiah Al Basri
Send photos of the bathroom
On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.
Prepare the surface
The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.
Apply the membrane
The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.
Dry, then tiling begins
The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.
Why Abraj Al Azl?
Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.
Bathroom waterproofing before tiling in Badiah Al BasriWe choose the method and the materials once we know the condition of the spot.
We serve Badiah Al Basri and around itIncluding Qatif, Ash Shariah and Al Qalah, as part of our work across the Eastern Province.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Badiah Al Basri
Is an old bathroom floor in Badiah Al Basri waterproofed before new tiles go down?
Yes, where needed. The damaged layer is removed, the concrete is inspected, and a continuous membrane is fitted before the new tiles to lower the chance of damp returning from below.
Do I need the walls checked if the damp is only on the bathroom floor?
Often yes, because water reaches the walls joined to the floor through the joints. Send photos of the walls beside the shower along with the floor so we can decide the right extent of waterproofing.
Can the membrane go straight over the render?
It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.
Do you offer bathroom waterproofing before tiling in Badiah Al Basri?
Yes. Badiah Al Basri is within our service area in the Eastern Province, and we also work in Qatif, Ash Shariah and Al Qalah. Call us or send photos of the spot on WhatsApp.
Does the surface need to be completely dry before the membrane is applied?
Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.
What decides the cost of waterproofing a bathroom before tiling?
The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.
The same service in nearby areas
Nearby areas we also cover: Qatif, Ash Shariah and Al Qalah.
More services in Badiah Al Basri



