Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ayn Dar al Qadimah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ayn Dar al Qadimah

Bitumen bathroom waterproofing in Ayn Dar al Qadimah starts with photos you send us by call or WhatsApp. The bathroom needs protection before the screed and tiles go down, and bitumen seals both the floor and wall base against water seepage.

Ayn Dar al Qadimah comprises scattered houses and villas across wide plots, each with one or more bathrooms. A new bathroom needs waterproofing before any finishes, while an old one may show lifted tiles or damp floors pointing to failed earlier sealing. Photos reveal the wall and floor condition, and whether old tiles must be removed first or if a new layer can go over them. Bitumen covers all corners and joints where water typically pools.

  • Ayn Dar al Qadimah is a hamlet in the Eastern Province, close to Ayn Dar and Ash Shuhayla', with scattered houses and villas.
  • A bathroom in the home endures concentrated daily moisture, so sealing before tiling stops water reaching the structure below.
What the service includes

What the service covers in Ayn Dar al Qadimah

  • Closing the waterproofing around drain openings and pipe entries
  • Applying bitumen layers over the floor including the shower area
  • Cleaning the surface and treating cracks and corners before application
  • Confirming full drying before the screed is poured
How we work

From first contact to the finished job in Ayn Dar al Qadimah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Ayn Dar al Qadimah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Ayn Dar al Qadimah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Ayn Dar al Qadimah

Do you remove old tiles before bitumen waterproofing the bathroom?

It depends on the tile and floor condition. If tiles are lifting or the floor is damp, removal is needed. Photos tell us what is required before we begin.

How is a small bathroom in an older villa in Ayn Dar al Qadimah sealed?

We apply bitumen to the floor and base after cleaning the surface and repairing any cracks. A small bathroom needs careful attention to corners and joints where water pools most. Photos help us understand the space and plan with you.

Do you cover Ayn Dar al Qadimah?

Yes. We serve Ayn Dar al Qadimah and nearby areas such as Ayn Dar, Ash Shuhayla' and Qusayba', from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Ayn Dar, Ash Shuhayla' and Qusayba'.

Other services in the area

More services in Ayn Dar al Qadimah

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Ayn Dar al Qadimah?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp