Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ash Shuhayla'

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ash Shuhayla'

Bitumen bathroom waterproofing in Ash Shuhayla' begins with photos of the floor and walls sent via WhatsApp or call. The village is inhabited by houses and villas, and bathrooms there are exposed to dampness due to the area's proximity to the coast and high humidity.

Ash Shuhayla' is a coastal village with varied houses and villas. Bathrooms in such areas face special challenges because coastal humidity penetrates concrete and causes dampness and deterioration over time. Applying bitumen to the bathroom floor and lower walls forms a shield against this moisture before tiling. Daily water use and leaks from pipes require multi-layered protection, and the photos sent pinpoint the problem exactly.

  • Ash Shuhayla' is a village in the Eastern Province, close to Khawr ah Dhi'abah, Salasil and Al Jabiriyah, with small houses and villas.
  • A coastal bathroom needs stronger waterproofing because humidity and salt in the air deepen concrete deterioration.
What the service includes

The main items of bitumen bathroom waterproofing in Ash Shuhayla'

  • Applying bitumen layers over the floor including the shower area
  • Confirming full drying before the screed is poured
  • Cleaning the surface and treating cracks and corners before application
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

The stages of the work in Ash Shuhayla'

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Bitumen bathroom waterproofing in Ash Shuhayla'We choose the method and the materials once we know the condition of the spot.

Start from Ash Shuhayla' with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Ash Shuhayla'

What is the difference between waterproofing a coastal bathroom and an inland one?

A coastal bathroom faces higher humidity and salt, putting more pressure on the water barrier. We use extra treatment for joints and corners in coastal bathrooms to withstand harsher conditions.

Does dampness in the bathroom come from outside humidity or internal leaks?

Photos and inspection help us tell the difference. If dampness is on the lower walls and corners, it may be from outside humidity or old leaks. Water under tiles usually points to pipe leaks or inadequate waterproofing under the floor.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

How do I request bitumen bathroom waterproofing in Ash Shuhayla'?

Call us, or send clear photos of the spot and its location in Ash Shuhayla' on WhatsApp, and we will work out the next step with you.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

The same service in nearby areas

We also work near Ash Shuhayla', in Khawr ah Dhi'abah, Salasil and AL Jabiriyah.

Other services in the area

More services in Ash Shuhayla'

Pool at night with water jets after waterproofing

Your first step in Ash Shuhayla':
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp