Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ayn Dar

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ayn Dar

Bitumen bathroom waterproofing in Ayn Dar starts with photos of the bathroom floor and lower walls, sent by call or WhatsApp. The village has scattered houses and villas on wide plots, where bathrooms need protection from damp before screed and tiling are laid.

Ayn Dar has houses and villas spread across wide plots, each with a bathroom of different size and design. The soil floor and concrete walls of a bathroom absorb moisture easily, especially near drain and water pipes. Bitumen forms a protective layer before concrete screed and tiling, stopping water from reaching the building's foundation. Photos show the floor and wall condition and where the pipes run so the right layer thickness can be chosen.

  • Ayn Dar is a village in the Eastern Province, near Ayn Dar al Qadimah and other villages such as Yakrub, with scattered houses and villas.
  • A bathroom in a rural house is prone to water seepage from the floor and lower walls because the soil holds moisture constantly.
What the service includes

What we do for you in Ayn Dar

  • Checking the concrete floor and wall bases and identifying cracks
  • Closing the waterproofing around drain openings and pipe entries
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
How we work

The stages of the work in Ayn Dar

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Your request from Ayn Dar comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Ayn Dar with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Ayn Dar

Does bitumen completely block water reaching the foundations of a bathroom?

Bitumen forms a strong water barrier when correctly applied over the entire bathroom floor and lower walls. Photos will show the structure's condition to determine whether prior seepage needs additional treatment.

When is bitumen applied after the bathroom area is excavated?

Bitumen is applied to the soil floor and lower walls before the concrete and sand screed is poured, then tiling follows after the concrete dries. Send photos of the site to confirm the right sequence.

What should I send you from Ayn Dar?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Ayn Dar, and we will work out the next step with you.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

Bitumen bathroom waterproofing near Ayn Dar

We also work near Ayn Dar, in Ayn Dar al Qadimah, Yakrub and Al Kidadiyah (near Ayn Dar).

Other services in the area

More services in Ayn Dar

Pool at night with water jets after waterproofing

In Ayn Dar and need bitumen bathroom waterproofing?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp