Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ash Shulah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ash Shulah

Bitumen bathroom waterproofing in Ash Shulah starts with photos of the bathroom and floor surface sent by call or WhatsApp. The district has diverse residential buildings, where bathrooms need a tight protective layer before flooring and tiles.

Ash Shulah has a mix of residential buildings, some older and others newer, reflected in bathroom conditions and moisture levels. In older buildings, moisture may already be present in the floor and walls, requiring extra preparation to clean the surface. Newer bathrooms need bitumen as a preventive measure from the start. Photos show the base condition, walls and existing damp to choose the right approach.

  • Ash Shulah is a district in the Eastern Province, close to Taibah, An Nada and Al Amal, with residential buildings of different ages.
  • Bathrooms in mixed-age residential buildings may need careful inspection for existing damp before bitumen is applied.
What the service includes

The scope of the work in Ash Shulah

  • Applying bitumen layers over the floor including the shower area
  • Cleaning the surface and treating cracks and corners before application
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Confirming full drying before the screed is poured
How we work

This is how we work in Ash Shulah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Ash Shulah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Bitumen bathroom waterproofing in Ash ShulahWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Ash Shulah

Do photos clearly show the damp condition in the bathroom?

Yes, photos show damp areas, dark stains and cracks indicating water leakage. From the photos we can determine whether preparation requires extra cleaning before bitumen is applied.

Can an old bathroom in Ash Shulah be waterproofed with bitumen after renovation?

Yes, but old tiles and materials must be removed first and the surface beneath verified as sound. Photos help judge the base condition and whether additional repairs are needed.

Is Ash Shulah within your service area?

Yes, Ash Shulah is one of the areas we work in, as are Taibah (near Dhahran), An Nada and Al Amal (near Dhahran). To start, call us or message us on WhatsApp.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Taibah (near Dhahran), An Nada and Al Amal (near Dhahran).

Other services in the area

More services in Ash Shulah

Pool at night with water jets after waterproofing

Tell us about your site in Ash Shulah
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp