Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Taibah (near Dhahran)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Taibah (near Dhahran)

Bathroom bitumen waterproofing in Taibah begins with a WhatsApp message showing the floor and the area around pipes. Taibah has houses and villas needing protection from water seepage before tile is laid.

Bathrooms in Taibah are built on concrete foundations that may be modern or older in style. Floors and lower walls face daily water exposure, and bitumen protects the surface from moisture penetration. Joints between pipes and concrete and around pipe entries are weak points needing special care. Photos show whether the concrete is cracked or intact before the waterproofing is applied.

  • Taibah is a residential district in the Eastern Province, near Al Manar, Ash Shulah and Al Amal.
  • The gap between a bathroom floor and pipes requires bitumen waterproofing to stop water seeping beneath the surface.
What the service includes

The main items of bitumen bathroom waterproofing in Taibah (near Dhahran)

  • Cleaning the surface and treating cracks and corners before application
  • Confirming full drying before the screed is poured
  • Applying bitumen layers over the floor including the shower area
  • Closing the waterproofing around drain openings and pipe entries
How we work

This is how we work in Taibah (near Dhahran)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Taibah (near Dhahran) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Taibah (near Dhahran) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Taibah (near Dhahran)

Can an old bathroom in Taibah be waterproofed before renovation?

Yes, if the underlying concrete is sound. Old tile and screed must be removed first, then the surface cleaned and bitumen applied before new finishing.

How many layers of bitumen are needed in a bathroom?

Usually one layer is enough, but it depends on the concrete condition and cracks. Send photos and we will agree on the right number based on the site's needs.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Is Taibah (near Dhahran) within your service area?

Yes, Taibah (near Dhahran) is one of the areas we work in, as are Al Manar (near Dammam), Ash Shulah and Al Amal (near Dhahran). To start, call us or message us on WhatsApp.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Manar (near Dammam), Ash Shulah and Al Amal (near Dhahran).

Other services in the area

More services in Taibah (near Dhahran)

Pool at night with water jets after waterproofing

Your first step in Taibah (near Dhahran):
a call or a WhatsApp message

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp