Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in An Nada

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in An Nada

Bitumen bathroom waterproofing in An Nada starts with a photo sent to us by call or WhatsApp. An Nada is a residential district with villas and apartment blocks, where the bathroom must be protected before screed and tiles are laid to prevent water reaching the floors below.

Bathrooms in An Nada range from modern villas to older apartment blocks, and in each case bitumen must cover the floor and wall joints before any screed or tiles. Slow seeping and leaks around showers and basins are common when protection is incomplete, and dampness may show on adjacent walls or the ceiling below. Photos of the bathroom and its corners show the current surface state and any extra prep needed before bitumen is applied.

  • An Nada is a district in the Eastern Province near Al Wahah, Al Faysaliyah and Ar Rawdah, with villas and apartment blocks.
  • Bathroom water seeps easily through small gaps in joints and corners if not protected by a sound bitumen layer.
What the service includes

The main items of bitumen bathroom waterproofing in An Nada

  • Closing the waterproofing around drain openings and pipe entries
  • Confirming full drying before the screed is poured
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
How we work

From first contact to the finished job in An Nada

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Your request from An Nada comes to usCall or WhatsApp on one number, and we answer you ourselves.

An Nada is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in An Nada

Can a bathroom in An Nada be waterproofed with bitumen just before tiling?

Waterproofing must be done before screed and tiles go down. The floor and corners are cleaned first, then bitumen is applied and left to dry fully before the next stage. Photos help us understand your work sequence.

Does bitumen protect an older bathroom floor in An Nada from rising damp?

Bitumen protects against water from above and sideways leaks from the bathroom itself. Rising moisture from below ground needs different treatment beneath the bitumen. Photos and details about the condition tell us whether extra treatment is needed.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

What should I send you from An Nada?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in An Nada, and we will work out the next step with you.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Wahah (near Dammam), Al Faysaliyah (near Dammam) and Ar Rawdah (near Dammam).

Other services in the area

More services in An Nada

Pool at night with water jets after waterproofing

In An Nada and need bitumen bathroom waterproofing?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp