Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in As Suqur District

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in As Suqur District

Bitumen bathroom waterproofing in As Suqur District starts with a photo sent by WhatsApp or call. The district has villas and apartment blocks of different ages, each with bathrooms that need a tight bitumen layer before tiling and screed.

The area mixes villas and apartment blocks of mixed ages, each with bathrooms that differ in design and materials. In older villas, bathrooms are usually small and their floors may show wear or damp marks. In newer blocks, bathrooms are larger and need careful waterproofing especially around pipes running under the floor. Bitumen is laid after plumbing is done and right before screed is poured, and it stops water reaching the layers below. Photos show the current floor condition, the space and the pipes.

  • As Suqur District is a residential area in Hofuf, Eastern Province, near Al Wurud Third District and Al Hada District.
  • Bathrooms in older villas tend to collect water because the original waterproofing degrades over time.
What the service includes

The bitumen bathroom waterproofing work in As Suqur District

  • Cleaning the surface and treating cracks and corners before application
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Applying bitumen layers over the floor including the shower area
  • Closing the waterproofing around drain openings and pipe entries
How we work

This is how we work in As Suqur District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

As Suqur District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Bitumen bathroom waterproofing in As Suqur DistrictWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in As Suqur District

Do we need to remove the old bathroom before laying new bitumen?

If the old bitumen is sound and crack-free, we may not need to remove it all, but it must be cleaned and any damage repaired. Send a photo and we will tell you if digging out and removing is necessary.

Can bitumen be laid in a bathroom with old rusted pipes?

Yes, but old rusted pipes must be replaced first because rust can pierce the bitumen over time. Tell us about the pipe condition in the photos so we can say whether replacement is needed.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Do you cover As Suqur District?

Yes. We serve As Suqur District and nearby areas such as Al Wurud Third District, Al Hada District and Al Quds District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

The same service in nearby areas

We also work near As Suqur District, in Al Wurud Third District, Al Hada District and Al Quds District.

Other services in the area

More services in As Suqur District

Pool at night with water jets after waterproofing

Tell us about your site in As Suqur District
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp