Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Hada District

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Hada District

Bitumen bathroom waterproofing in Al Hada District begins with a WhatsApp message containing photos of the floor and walls. The district has a mix of villas and residential blocks, each with different waterproofing needs based on bathroom design and building age.

Al Hada bathrooms reflect the district's architectural diversity: villas have multiple varied bathrooms while residential blocks have space-limited ones. Older villas may show old damp marks or leaks under the tiles, and new blocks need preventive protection from the start. Bitumen is painted on concrete before screed and tiling, and photos help determine whether waterproofing is for new construction or repairing an existing condition.

  • Al Hada is a residential district in the Eastern Province, neighbouring Al Omaraa, As Suqur and Al Wurud Third districts.
  • A bathroom in a villa or block may differ greatly in its ground position and surrounding moisture level.
What the service includes

The main items of bitumen bathroom waterproofing in Al Hada District

  • Confirming full drying before the screed is poured
  • Cleaning the surface and treating cracks and corners before application
  • Closing the waterproofing around drain openings and pipe entries
  • Checking the concrete floor and wall bases and identifying cracks
How we work

From first contact to the finished job in Al Hada District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Al Hada District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We serve Al Hada District and around itIncluding Al Omaraa District, As Suqur District and Al Wurud Third District, as part of our work across the Eastern Province.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Al Hada District

Does waterproofing method differ between a villa and a block bathroom?

Yes, it may differ based on bathroom location, groundwater level and available space. Photos show the building type and location, so we can choose the right method.

What is the difference between waterproofing a new and an existing bathroom?

A new bathroom is waterproofed on clean concrete before finishes. An existing one may need partial tile removal first if photos show damp or leakage. Each case needs separate assessment.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

What should I send you from Al Hada District?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Hada District, and we will work out the next step with you.

Nearby areas

The same service in nearby areas

Nearby areas we also cover: Al Omaraa District, As Suqur District and Al Wurud Third District.

Other services in the area

More services in Al Hada District

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Al Hada District?
Call us now

Describe the problem and where it is in Al Hada District, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp