Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Quds District

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Quds District

Bitumen waterproofing for bathrooms in Al Quds District begins with a message containing floor and wall base photos sent via WhatsApp or phone. The district includes varied homes and villas, their bathrooms need protection from water and moisture before tiling, and the solution depends on what the photos show about the surface condition.

Al Quds District has homes and villas of different designs and building periods. Bathrooms face daily water and steam, with floors and wall bases either old or new. Bitumen is applied to the clean surface before screed and tiles to prevent water seeping to the layers below. Application steps vary with concrete condition, age and any existing cracks, and photos show whether there are damp problems or cracks needing further work.

  • Al Quds District is a residential district in the Eastern Province near Al Muhandisin District and Al Badriyah District.
  • A residential bathroom needs strong waterproofing because it faces direct and continuous water exposure every day.
What the service includes

The scope of the work in Al Quds District

  • Confirming full drying before the screed is poured
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
  • Closing the waterproofing around drain openings and pipe entries
How we work

The stages of the work in Al Quds District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Your request from Al Quds District comes to usCall or WhatsApp on one number, and we answer you ourselves.

Al Quds District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in Al Quds District

What is the difference between waterproofing old and new bathrooms with bitumen?

An old bathroom may have cracks or weak joints needing treatment before bitumen. A new bathroom usually has a clean surface but also needs proper preparation. Photos show each bathroom's condition in detail to determine what steps are needed.

Does bitumen protect bathroom walls from damp in Al Quds District?

Bitumen is applied to the floor and lower walls to a certain height before tiling to prevent damp rising from below. High humidity and intense heat require correct application, and photos sent to us help determine the right height and protection method.

Do you offer bitumen bathroom waterproofing in Al Quds District?

Yes. Al Quds District is within our service area in the Eastern Province, and we also work in Al Muhandisin District, Al Badriyah District and As Suqur District. Call us or send photos of the spot on WhatsApp.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Nearby areas

Bitumen bathroom waterproofing near Al Quds District

Nearby areas we also cover: Al Muhandisin District, Al Badriyah District and As Suqur District.

Other services in the area

More services in Al Quds District

Pool at night with water jets after waterproofing

Your first step in Al Quds District:
a call or a WhatsApp message

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp