Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in An Nayfiyah District

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in An Nayfiyah District

Bitumen bathroom waterproofing in An Nayfiyah District starts with photos of the bathroom floor and wall bases, sent by call or WhatsApp. It goes on before the screed and tiles, with its scope set by what the photos show.

An Nayfiyah District is largely made up of homes and multi-storey residential buildings, with bathroom ages that vary noticeably. In older bathrooms, dampness concentrates around the drain edge and at the inner wall base. The photos show which case applies to yours before a method is chosen.

  • An Nayfiyah District is a district in Al Ahsa in the Eastern Province, lying close to Al Aziziyah Second, Ghirnatah and the Government Departments Complex Second District.
  • Bathrooms on multi-storey buildings experience more movement at the joints than ground-level ones, so edges can separate over time.
What the service includes

The scope of the work in An Nayfiyah District

  • Applying bitumen layers over the floor including the shower area
  • Checking the concrete floor and wall bases and identifying cracks
  • Cleaning the surface and treating cracks and corners before application
  • Closing the waterproofing around drain openings and pipe entries
How we work

How we carry out bitumen bathroom waterproofing in An Nayfiyah District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Start from An Nayfiyah District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve An Nayfiyah District and around itIncluding Al Aziziyah Second District, Ghirnatah District and Government Departments Complex Second District, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in An Nayfiyah District

Can a flat bathroom in An Nayfiyah be waterproofed without breaking up the floor?

That depends on the tiles and screed. Send photos of the floor and walls and we will tell you whether treatment is possible without full demolition.

Where do leaks most often occur in An Nayfiyah bathrooms?

Most often at the drain edge and the inner wall base, both clearly visible in photos and used to define the scope of work.

What should I send you from An Nayfiyah District?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in An Nayfiyah District, and we will work out the next step with you.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

Bitumen bathroom waterproofing near An Nayfiyah District

We also work near An Nayfiyah District, in Al Aziziyah Second District, Ghirnatah District and Government Departments Complex Second District.

Other services in the area

More services in An Nayfiyah District

Pool at night with water jets after waterproofing

We start with you in An Nayfiyah District
with one call

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp