Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ghirnatah District

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ghirnatah District

We apply bitumen bathroom waterproofing in Ghirnatah District in Hofuf, starting from photos of the floor and wall bases sent by call or WhatsApp. Bitumen goes on before the screed and tiling to shield the lower layers from water seepage.

The district consists of mid-size homes and adjoining houses, with bathrooms ranging from recent to older builds. Older ones tend to suffer cracked tiles and leaking joints, while newer ones usually need their corners and joints checked carefully. The photos decide what needs treating before the lining method is chosen.

  • Ghirnatah is a district of Hofuf in Al-Ahsa, Eastern Province, near An Nayfiyah, Al Muhandisin and Al Jawharah.
  • Cracked tiles in older bathrooms often let water reach the layer beneath.
What the service includes

What the service covers in Ghirnatah District

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Checking the concrete floor and wall bases and identifying cracks
  • Closing the waterproofing around drain openings and pipe entries
  • Confirming full drying before the screed is poured
How we work

This is how we work in Ghirnatah District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Bitumen bathroom waterproofing in Ghirnatah DistrictWe choose the method and the materials once we know the condition of the spot.

We serve Ghirnatah District and around itIncluding An Nayfiyah District, Al Muhandisin District and Al Jawharah District, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Ghirnatah District

Is cracked tile treated before bitumen is applied in Ghirnatah?

Yes, cracks are treated and sealed so the layers bond together. Send photos of the cracked tiles so we can judge whether they must come up or can be treated in place.

How do I know if my bathroom joints need waterproofing?

Damp at the corners or dark staining along the joints is a common sign. Send close-up photos of these spots on WhatsApp so the need can be assessed accurately.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Do you cover Ghirnatah District?

Yes. We serve Ghirnatah District and nearby areas such as An Nayfiyah District, Al Muhandisin District and Al Jawharah District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Nearby areas

Bitumen bathroom waterproofing near Ghirnatah District

If the site is outside Ghirnatah District, the same service is available in An Nayfiyah District, Al Muhandisin District and Al Jawharah District.

Other services in the area

More services in Ghirnatah District

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Ghirnatah District?
Call us now

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp