Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Aziziyah Second District

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Aziziyah Second District

Bitumen bathroom waterproofing in Al Aziziyah Second District begins with photos of the bathroom and surface sent to us by call or WhatsApp. The district has villas and homes, their bathroom floors needing effective waterproofing before screed and tiles are laid.

Homes and villas in Al Aziziyah Second District vary in construction and age, with bathrooms needing strong moisture protection. Floors exposed to shower and sink water daily, and lower walls around shower and basin, all risk slow seepage if bitumen is not carefully applied before screed. Seeping water moves into lower layers, damaging concrete and foundations and causing rising damp in walls. Intense summer heat and high moisture on the Eastern Province's coastal surface compound deterioration risk. Photos determine whether you are building a new bathroom or treating an existing leak.

  • Al Aziziyah Second District is a residential district in the Eastern Province, near Al Bandariyah, An Nayfiyah and Al Hufayrah Districts, with villas and homes.
  • Modern bathrooms in villas require high-quality bitumen applied before screed, to ensure protection from leaks over the years.
What the service includes

What the service covers in Al Aziziyah Second District

  • Cleaning the surface and treating cracks and corners before application
  • Confirming full drying before the screed is poured
  • Closing the waterproofing around drain openings and pipe entries
  • Checking the concrete floor and wall bases and identifying cracks
How we work

The stages of the work in Al Aziziyah Second District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Al Aziziyah Second District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Al Aziziyah Second District comes to usCall or WhatsApp on one number, and we answer you ourselves.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Al Aziziyah Second District

Does bitumen bathroom waterproofing require special treatment at corners and joints?

Yes, corners and joints are weak points where water leaks easily. Bitumen application in these areas needs precision and extra layers. Photos show the condition of these points.

How long does bitumen bathroom waterproofing take in Al Aziziyah Second District?

Duration depends on bathroom size, surface condition, and whether you are building new or repairing existing leaks. The initial photos and call will clarify the work timeline.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Do you cover Al Aziziyah Second District?

Yes. We serve Al Aziziyah Second District and nearby areas such as Al Bandariyah District, An Nayfiyah District and Al Hufayrah District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Aziziyah Second District, in Al Bandariyah District, An Nayfiyah District and Al Hufayrah District.

Other services in the area

More services in Al Aziziyah Second District

Pool at night with water jets after waterproofing

In Al Aziziyah Second District and need bitumen bathroom waterproofing?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp