Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Hufayrah District

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Hufayrah District

Bathroom waterproofing with bitumen in Al Hufayrah District is laid under the floor and along the wall bases, beneath the mortar bed and tiles. We serve Al Hufayrah, a district in the Eastern Province, and the work begins once you send photos of the bathroom by call or WhatsApp.

Al Hufayrah is a district of residential blocks and houses, and its bathrooms are often stacked one above another in multi-storey buildings. A leak from an upper bathroom can reach the rooms below, so the floor and wall bases matter to the flats underneath as well as to the owner. Plumbing and drain work often runs inside the same walls, so we check it in the photos before setting the scope. The photos show the type of building and what sits beneath each bathroom.

  • Al Hufayrah District is a residential district in the Eastern Province, close to Al Salmaniyah Third District and Munifah District.
  • Bathrooms stacked over other flats need their floor waterproofing checked before any tiles are fixed.
What the service includes

The main items of bitumen bathroom waterproofing in Al Hufayrah District

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Applying bitumen layers over the floor including the shower area
  • Closing the waterproofing around drain openings and pipe entries
  • Cleaning the surface and treating cracks and corners before application
How we work

The stages of the work in Al Hufayrah District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Al Hufayrah District is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Al Hufayrah District with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Al Hufayrah District

Can you check a bathroom above another flat in Al Hufayrah?

Yes, through photos of the floor, the walls and the ceiling below if it can be photographed. Tell us which flat sits underneath, so the work covers both rooms together.

Is bitumen used in Al Hufayrah flats with existing tiles?

It depends on whether the existing tiles can stay and whether the mortar beneath them is sound. The photos decide that, and we will tell you before anything is removed.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

How do I request bitumen bathroom waterproofing in Al Hufayrah District?

Call us, or send clear photos of the spot and its location in Al Hufayrah District on WhatsApp, and we will work out the next step with you.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Nearby areas

The same service in nearby areas

We also work near Al Hufayrah District, in Al Salmaniyah Third District, Al Aziziyah Second District and Munifah District.

Other services in the area

More services in Al Hufayrah District

Pool at night with water jets after waterproofing

Tell us about your site in Al Hufayrah District
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp