Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in An Naqa

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in An Naqa

Bitumen waterproofing for bathrooms in An Naqa starts with photos of the floor and walls sent by call or WhatsApp. Bitumen protects the surface from water seepage before construction is finished.

An Naqa is a residential district with villas and small apartment blocks of various ages. Bathrooms in new villas need precise waterproofing from the start, while in older buildings damp marks may appear around the base and corners requiring special treatment. Bitumen must seal the entire floor and wall base tightly, and the surface may need cleaning and minor repair before work begins. Photos and a call will help us understand your situation clearly.

  • An Naqa is a district in the Eastern Province near Ad Dirah Two and Al Khisab, with villas and residential apartment blocks.
  • Bathroom corners and areas around pipe entries are sensitive spots requiring tight bitumen waterproofing.
What the service includes

What we do for you in An Naqa

  • Applying bitumen layers over the floor including the shower area
  • Cleaning the surface and treating cracks and corners before application
  • Checking the concrete floor and wall bases and identifying cracks
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

From first contact to the finished job in An Naqa

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

An Naqa is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from An Naqa with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in An Naqa

Can bitumen withstand high heat and moisture in an An Naqa bathroom?

Yes, bitumen is designed to withstand wet and hot environments. In the Eastern Province where humidity is high year-round, bitumen gives reliable long-term protection against water seepage.

Must we clear out an old bathroom before bitumen waterproofing in An Naqa?

Yes, the bathroom must be empty and its surface clean and dry before we start. Send photos showing the current state, and we will tell you what preparation steps are needed.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

What should I send you from An Naqa?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in An Naqa, and we will work out the next step with you.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

The same service in nearby areas

We also work near An Naqa, in Ad Dirah Two, Al Khisab and An Noor (near Sayhat).

Other services in the area

More services in An Naqa

Pool at night with water jets after waterproofing

In An Naqa and need bitumen bathroom waterproofing?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp