Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Ad Dirah Two

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Ad Dirah Two

Bitumen waterproofing for bathrooms in Ad Dirah Two goes on before the screed and tiling, and the work starts with photos sent by call or WhatsApp. The district includes many residential homes where bathroom floors and tile ages vary.

Ad Dirah Two consists of houses, villas and residential buildings, and many of its bathrooms have been re-tiled more than once, which can hide the true condition of the floor beneath. Bitumen is applied to the concrete base and into the wall corners before the screed, protecting the lower layers from water. The photos reveal whether the base is sound and whether the corners need treatment before lining.

  • Ad Dirah Two is a residential district of Hofuf in Al-Ahsa, in the Eastern Province, lying close to An Naqa and An Noor.
  • Wall corners at the floor line are among the points where bathroom water most often gets through, so they are treated before the open areas.
What the service includes

The bitumen bathroom waterproofing work in Ad Dirah Two

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
  • Closing the waterproofing around drain openings and pipe entries
  • Checking the concrete floor and wall bases and identifying cracks
How we work

The stages of the work in Ad Dirah Two

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Start from Ad Dirah Two with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Bitumen bathroom waterproofing in Ad Dirah TwoWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Ad Dirah Two

Does a re-tiled bathroom in Ad Dirah Two need new waterproofing?

That depends on what lies under the current tiles. If the base is visible in the photos, we can tell whether the old lining is sound or needs renewing.

Do you treat wall corners in bathrooms in Ad Dirah Two?

Yes, wall corners at floor level are among the most important points in lining. The photos show what the corners need before screed.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Do you cover Ad Dirah Two?

Yes. We serve Ad Dirah Two and nearby areas such as An Naqa, An Noor (near Sayhat) and As Salam (near Sayhat), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Nearby areas

We also offer it in neighbouring areas

We also offer bitumen bathroom waterproofing in An Naqa, An Noor (near Sayhat) and As Salam (near Sayhat), among the closest areas to Ad Dirah Two.

Other services in the area

More services in Ad Dirah Two

Pool at night with water jets after waterproofing

In Ad Dirah Two and need bitumen bathroom waterproofing?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp