Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in An Naqa

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in An Naqa

Bathroom waterproofing before tiling in An Naqa starts with WhatsApp photos of the floor and wet walls. The district has houses and villas of varying ages, and each bathroom needs a continuous waterproof membrane before tiles and adhesive go down.

Bathrooms in An Naqa vary between older and newer, with floors and walls differing in moisture absorption and crack resistance. An older bathroom may show dampness around pipes or at corners, while a newer one might have a large floor needing complete protection. The waterproof membrane is applied to the existing surface before any tile, ensuring water does not seep into the layers below. Photos show the condition of the walls and floor to define the scope.

  • An Naqa is a district in the Eastern Province, near Ad Dirah Two, Al Khisab and An Noor.
  • A bathroom without a waterproof membrane before tiling allows water to seep into the concrete and walls beneath.
What the service includes

What the service covers in An Naqa

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Forming and treating the floor-to-wall corners before the main layer
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

The stages of the work in An Naqa

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

We serve An Naqa and around itIncluding Ad Dirah Two, Al Khisab and An Noor (near Sayhat), as part of our work across the Eastern Province.

Start from An Naqa with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in An Naqa

Is a waterproof membrane needed in every older bathroom in An Naqa?

Yes, if correct tiling before standing water is wanted. The floor and walls are examined from photos first to pinpoint areas needing protection.

Can the waterproof membrane be applied to an uneven bathroom floor?

That depends on how uneven the surface is. Photos show whether the variations are minor or significant, and in both cases we agree the right method with you.

Is An Naqa within your service area?

Yes, An Naqa is one of the areas we work in, as are Ad Dirah Two, Al Khisab and An Noor (near Sayhat). To start, call us or message us on WhatsApp.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Nearby areas

Areas near An Naqa

We also work near An Naqa, in Ad Dirah Two, Al Khisab and An Noor (near Sayhat).

Other services in the area

More services in An Naqa

Worker applying the white insulation layer on a villa roof by the sea

Tell us about your site in An Naqa
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp