Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Wasadah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Wasadah

Bitumen bathroom waterproofing in Al Wasadah is applied to the floor and the wall bases before the screed and tiles go down. Send photos of the bathroom floor and the joints by WhatsApp or call, and we will tell you whether bitumen suits the room you have.

Al Wasadah is largely made up of houses and small residential buildings, and many of them have one bathroom above another. Floors are often opened to pass pipes through, so the bitumen layer has to meet the wall bases and the drain outlet with no gap. Where old tiling has lifted, we check the joints first. Whether bitumen is the right choice depends on the floor you have, and the photos show that.

  • Al Wasadah is a district in the Eastern Province, lying close to Bab As Sab and Al Madani.
  • Bitumen must be laid on a dry, clean base, so the surface is prepared before any coat goes on.
What the service includes

The bitumen bathroom waterproofing work in Al Wasadah

  • Closing the waterproofing around drain openings and pipe entries
  • Cleaning the surface and treating cracks and corners before application
  • Applying bitumen layers over the floor including the shower area
  • Confirming full drying before the screed is poured
How we work

The stages of the work in Al Wasadah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

We serve Al Wasadah and around itIncluding Bab As Sab, Al Bustan Two and Al Madani, as part of our work across the Eastern Province.

Al Wasadah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Wasadah

Can bitumen go over an existing bathroom floor?

Sometimes, when the old tiling is firmly bonded and the floor is level. Loose or hollow tiles usually have to come off first, and the photos will show us which case you have.

Is bitumen used on the walls of a bathroom too?

Usually at the wall bases, where water collects against the floor. How far up the wall it goes depends on your bathroom and the shower position, so send photos of both.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Do you cover Al Wasadah?

Yes. We serve Al Wasadah and nearby areas such as Bab As Sab, Al Bustan Two and Al Madani, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Nearby areas

Areas near Al Wasadah

We also offer bitumen bathroom waterproofing in Bab As Sab, Al Bustan Two and Al Madani, among the closest areas to Al Wasadah.

Other services in the area

More services in Al Wasadah

Pool at night with water jets after waterproofing

Your first step in Al Wasadah:
a call or a WhatsApp message

Describe the problem and where it is in Al Wasadah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp