Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Bab As Sab

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Bab As Sab

Bitumen bathroom waterproofing in Bab As Sab starts with photos sent by call or WhatsApp. The district has houses and villas, where the bathroom needs protection before screed and tiling to stop water reaching the walls and foundation.

Bathrooms here face daily moisture from use, and older floors and bases may be deteriorated by past leaks. Bitumen forms a barrier between the concrete and screed before tiling, protecting walls and foundations from damp. The photos show the base condition and whether cracks or existing moisture are present before we choose the right coverage.

  • Bab As Sab is a district in the Eastern Province, close to Al Wasadah and Al Bustan Two, with houses and small villas.
  • A bathroom without waterproofing before tiling allows water to seep into the layers beneath.
What the service includes

The main items of bitumen bathroom waterproofing in Bab As Sab

  • Applying bitumen layers over the floor including the shower area
  • Cleaning the surface and treating cracks and corners before application
  • Checking the concrete floor and wall bases and identifying cracks
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

This is how we work in Bab As Sab

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Start from Bab As Sab with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We serve Bab As Sab and around itIncluding Al Wasadah, Al Bustan Two and Ash Shamasiyyah, as part of our work across the Eastern Province.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Bab As Sab

When should a bathroom floor in Bab As Sab be bitumen-waterproofed?

Just before the screed and tiling go down. If you are renovating an old bathroom and see damp or cracks, send photos first so we can tell if the concrete floor is sound enough for waterproofing.

Is bitumen alone enough to stop damp in a bathroom with a deteriorated base?

That depends on how severe the damage is. Photos show if the concrete is water-logged or deeply cracked; we may need to treat cracks and leaks first before the bitumen goes on.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

How do I request bitumen bathroom waterproofing in Bab As Sab?

Call us, or send clear photos of the spot and its location in Bab As Sab on WhatsApp, and we will work out the next step with you.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Nearby areas

Bitumen bathroom waterproofing near Bab As Sab

Nearby areas we also cover: Al Wasadah, Al Bustan Two and Ash Shamasiyyah.

Other services in the area

More services in Bab As Sab

Pool at night with water jets after waterproofing

Tell us about your site in Bab As Sab
and we will plan the next step with you

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp