
Bitumen bathroom waterproofing in Al Madani
We waterproof bathrooms with bitumen in Al Madani, Al Ahsa, starting from photos of the bathroom floor and wall bases you send by call or WhatsApp. The bitumen goes on before the screed is poured and the tiles are laid, keeping water away from what lies below.
Al Madani includes houses and small residential buildings, some of them older homes where bathrooms are refitted years later. In these properties damp usually shows at the corners and around the drain outlet, so the work is directed there. The photos reveal whether the floor is exposed or whether an earlier layer has to be removed.
- Al Madani is a residential district in Al Ahsa in the Eastern Province, close to Al Jarrari, Al Madaris and Bab Madinah Ash Shamal.
- In older bathrooms the screed tends to crack at the edges before the centre, and damp starts from there.
What we do for you in Al Madani
- Applying bitumen layers over the floor including the shower area
- Confirming full drying before the screed is poured
- Checking the concrete floor and wall bases and identifying cracks
- Cleaning the surface and treating cracks and corners before application
How we carry out bitumen bathroom waterproofing in Al Madani
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Al Madani is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Bitumen bathroom waterproofing in Al MadaniWe choose the method and the materials once we know the condition of the spot.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Al Madani
Are older bathrooms in Al Madani waterproofed with bitumen?
Yes, as long as the floor can take the lining. Flaking surfaces are treated first and then the bitumen is applied; the photos will show whether the condition allows it.
Where does the waterproofing start inside a bathroom in Al Madani?
It starts at the floor, runs up to the wall bases and is sealed at the corners and pipe entries before the screed goes over it. Send a photo of the space so we can pinpoint where to begin.
Is bitumen right for bathroom walls as well as the floor?
Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.
Is Al Madani within your service area?
Yes, Al Madani is one of the areas we work in, as are Al Jarrari, Al Madaris and Bab Madinah Ash Shamal. To start, call us or message us on WhatsApp.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
We also offer it in neighbouring areas
If the site is outside Al Madani, the same service is available in Al Jarrari, Al Madaris and Bab Madinah Ash Shamal.
More services in Al Madani




