Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Jarrari

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Jarrari

Bitumen bathroom waterproofing in Al Jarrari starts with photos of the bathroom floor and wall bases, sent by call or WhatsApp. The district has houses and residential buildings, and the layer goes on before the screed and tiling.

Al Jarrari is dominated by detached houses and small residential units, where bathrooms may have been built at different times using varying materials. Older tiling often cracks at corners and around drain openings, letting water find a path beneath. The right solution depends on the floor's condition and the bathroom's layout, which the photos make clear.

  • Al Jarrari is a district in Al-Ahsa Governorate in the Eastern Province, lying close to Bab Madinah Ash Shamal, Mayyas and Al Madani.
  • Bathroom floors vary widely in the district depending on when they were built, so treatment differs from house to house.
What the service includes

What the service covers in Al Jarrari

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Applying bitumen layers over the floor including the shower area
  • Confirming full drying before the screed is poured
  • Checking the concrete floor and wall bases and identifying cracks
How we work

This is how we work in Al Jarrari

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

We serve Al Jarrari and around itIncluding Bab Madinah Ash Shamal, Mayyas and Al Madani, as part of our work across the Eastern Province.

Bitumen bathroom waterproofing in Al JarrariWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Al Jarrari

Can an old bathroom in Al Jarrari be waterproofed without removing the tiles?

It depends on the tiles and the floor beneath; sometimes application over a prepared surface is enough. The photos will show whether removal is needed.

What sets apart the bathrooms in detached Al Jarrari houses?

They are often built in stages with mixed materials, so a newer floor may sit beside an older one. We therefore check each bathroom individually before choosing the layer.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

What should I send you from Al Jarrari?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Jarrari, and we will work out the next step with you.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Jarrari, in Bab Madinah Ash Shamal, Mayyas and Al Madani.

Other services in the area

More services in Al Jarrari

Pool at night with water jets after waterproofing

In Al Jarrari and need bitumen bathroom waterproofing?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp