Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Jarrari

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Jarrari

Bathroom waterproofing before tiling in Al Jarrari starts with photos of the floor and walls, sent by call or WhatsApp. The area has family homes and scattered houses in Al-Ahsa, and a continuous membrane under the tiles is what protects the floor from seeping water.

Houses in Al Jarrari vary in age, and some older ones may have floors that are less tight than they should be. Tiling a bathroom that was never sealed lets water through the grout lines and into the layers below. The membrane therefore goes on the floor and the walls around drains and joints, and the photos show whether the existing floor needs repair first.

  • Al Jarrari is a residential district in the Al-Ahsa governorate of the Eastern Province, close to Bab Madinah Ash Shamal, Mayyas and Al Madani.
  • An old unsealed floor can look sound on top while water works its way through from beneath the tiles over time.
What the service includes

The main items of bathroom waterproofing before tiling in Al Jarrari

  • Forming and treating the floor-to-wall corners before the main layer
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

This is how we work in Al Jarrari

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Your request from Al Jarrari comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Al Jarrari with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Jarrari

Do you waterproof bathrooms in older houses in Al Jarrari?

Yes, we waterproof both older and newer bathrooms. The photos will show whether the floor needs treatment before the membrane goes on.

How long between waterproofing and tiling in Al Jarrari?

The membrane is left to dry according to the product's instructions before adhesive and tiles go on. We will set the right time for your case when we review the photos together.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Is Al Jarrari within your service area?

Yes, Al Jarrari is one of the areas we work in, as are Bab Madinah Ash Shamal, Mayyas and Al Madani. To start, call us or message us on WhatsApp.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Nearby areas

We also offer it in neighbouring areas

We also work near Al Jarrari, in Bab Madinah Ash Shamal, Mayyas and Al Madani.

Other services in the area

More services in Al Jarrari

Worker applying the white insulation layer on a villa roof by the sea

Bathroom waterproofing before tiling in Al Jarrari?
Call us now

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp