Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Mayyas

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Mayyas

Bathroom waterproofing before tiling in Mayyas starts with photos sent by call or WhatsApp. The district has multiple houses and villas of varying size and age.

Bathrooms in Mayyas vary by building age and house or villa size. A small bathroom in an old house may need full treatment, and a large bathroom in a new villa needs professional waterproofing across the entire floor and walls. Coastal humidity affects all bathrooms equally, so sound waterproofing is essential. Water and steam require continuous protection, and photos show the current surface condition before the right method is chosen.

  • Mayyas is a district in the Eastern Province near Al Jarrari, Ash Shariah and Al Madaris, with a number of houses and villas.
  • Bathroom walls and floors face daily moisture, so new waterproofing must handle this stress for years.
What the service includes

The main items of bathroom waterproofing before tiling in Mayyas

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Leaving the membrane to dry and cure before adhesive and tiling begin
  • Cleaning the surface, removing loose parts and treating hairline cracks
  • Applying the membrane over the full floor and up the walls in the wet zone
How we work

From first contact to the finished job in Mayyas

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Sealed before it is closedOnce tiled, the membrane cannot be reached, so getting it right before tiling matters far more than any repair afterwards.

Mayyas is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Start from Mayyas with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bathroom waterproofing before tiling in Mayyas

Can part of a bathroom in Mayyas be waterproofed without waterproofing the whole bathroom?

It is best to waterproof the whole bathroom to ensure full protection. Treating only part of it may leave weak areas where water can leak. Photos help us explain what is best for your case.

Does a newly built bathroom in Mayyas need waterproofing before tiling?

Yes, all new bathrooms need waterproofing before tiling. This ensures strong protection from the start and prevents problems later. Send photos of the new bathroom so we can begin with you.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

Do you cover Mayyas?

Yes. We serve Mayyas and nearby areas such as Al Jarrari, Ash Shariah and Al Madaris, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Bathroom waterproofing before tiling near Mayyas

We also work near Mayyas, in Al Jarrari, Ash Shariah and Al Madaris.

Other services in the area

More services in Mayyas

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Mayyas
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp