Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Uyaynah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Uyaynah

Bitumen bathroom waterproofing in Al Uyaynah starts with photos of the bathroom floor and lower walls sent by call or WhatsApp. The hamlet has scattered houses and villas, and each needs strong waterproofing before tiling.

Al Uyaynah is a small hamlet with houses and villas spread over separate plots. Older houses may have foundations on raw soil, newer ones on better concrete bases. A bathroom in either may face dampness from a different source: in older ones from damp soil, in newer ones from pipe leaks. Bitumen protects against both. Knowing the floor and base condition helps us choose the right bitumen thickness and treatment.

  • Al Uyaynah is a hamlet in the Eastern Province, close to Al Qulayyib, Al Wannan and Rizhan.
  • Villas in remote hamlets may have older pipes more prone to leaking than newer buildings in towns.
What the service includes

The bitumen bathroom waterproofing work in Al Uyaynah

  • Applying bitumen layers over the floor including the shower area
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Confirming full drying before the screed is poured
  • Closing the waterproofing around drain openings and pipe entries
How we work

The stages of the work in Al Uyaynah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Start from Al Uyaynah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Al Uyaynah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Al Uyaynah

Is bitumen the only solution for a damp bathroom in Al Uyaynah?

Bitumen is the main barrier we apply before screed and tiling. We may also need other treatment such as fixing pipes if they are the cause, or repairing large cracks. The photos and details you share help us decide.

Does bitumen protect against standing water around my villa in Al Uyaynah?

Bitumen protects against water seeping into the bathroom, but protection from standing water around the base needs good external drainage. Together they form complete protection. Send photos of the bathroom and around the foundation so we can assess the whole situation.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Is Al Uyaynah within your service area?

Yes, Al Uyaynah is one of the areas we work in, as are Al Qulayyib, Al Wannan and Rizhan. To start, call us or message us on WhatsApp.

Nearby areas

Bitumen bathroom waterproofing near Al Uyaynah

Nearby areas we also cover: Al Qulayyib, Al Wannan and Rizhan.

Other services in the area

More services in Al Uyaynah

Pool at night with water jets after waterproofing

We start with you in Al Uyaynah
with one call

Describe the problem and where it is in Al Uyaynah, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp