Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Qulayyib

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Qulayyib

Bitumen waterproofing for bathrooms in Al Qulayyib begins with photos of the concrete and walls sent by call or WhatsApp. Al Qulayyib is a small village with scattered villas and houses, and bathrooms need moisture protection before tiling.

Al Qulayyib consists of old and new houses and villas spread across wide plots. Local bathrooms face natural moisture from daily use and may be affected by groundwater, especially in foundations close to the surface. Bitumen forms a waterproof layer on the floor and lower walls to prevent water absorption and protect concrete. Quality depends on careful application around drains, pipes and outlets. Photos help assess the foundation's condition and current moisture levels.

  • Al Qulayyib is a village in the Eastern Province near Al Uyaynah and Al Wannan, with houses and villas on scattered plots.
  • Foundations in villages may be close to groundwater level, so reliable waterproofing maintains the building's integrity over time.
What the service includes

What we do for you in Al Qulayyib

  • Closing the waterproofing around drain openings and pipe entries
  • Cleaning the surface and treating cracks and corners before application
  • Confirming full drying before the screed is poured
  • Checking the concrete floor and wall bases and identifying cracks
How we work

The stages of the work in Al Qulayyib

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Your request from Al Qulayyib comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Al Qulayyib with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Qulayyib

How do I know if a bathroom in Al Qulayyib needs urgent waterproofing?

Signs like damp on walls and floors, dark stains or bad smells indicate leaks or high moisture. Send photos of affected areas via WhatsApp so we can assess them.

Can an old bathroom in Al Qulayyib be waterproofed with bitumen after removing old tiles?

Yes, after tile and mortar removal we inspect the concrete. If it is sound we apply bitumen directly; if it has deep cracks we repair them first. Photos show the surface condition.

Do you offer bitumen bathroom waterproofing in Al Qulayyib?

Yes. Al Qulayyib is within our service area in the Eastern Province, and we also work in Al Uyaynah, Al Wannan and Rizhan. Call us or send photos of the spot on WhatsApp.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Nearby areas

The same service in nearby areas

If the site is outside Al Qulayyib, the same service is available in Al Uyaynah, Al Wannan and Rizhan.

Other services in the area

More services in Al Qulayyib

Pool at night with water jets after waterproofing

We start with you in Al Qulayyib
with one call

Describe the problem and where it is in Al Qulayyib, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp