
Bitumen bathroom waterproofing in Al Wannan
Bitumen bathroom waterproofing in Al Wannan begins with photos of the floor and lower walls, sent by call or WhatsApp. The village has houses and villas, where the bathroom needs a strong barrier layer before tiles and screed.
Al Wannan has buildings ranging from older houses to newer villas, each with different needs depending on the structure's age. An older bathroom may show prolonged seepage from old tiles, while a new one needs preventive waterproofing from the start. Moisture seeps through joints and fine cracks, and bitumen creates a barrier layer under the screed that protects the concrete. Photos show the floor condition, corners and joints, so we decide the right method with you.
- Al Wannan is a village in the Eastern Province, close to Rizhan, Az Zughayn and As Sarrar, with scattered houses, villas and small plots.
- A daily-use bathroom faces steam and hot water, so the waterproof layer must withstand continuous moisture and heat.
What we do for you in Al Wannan
- Closing the waterproofing around drain openings and pipe entries
- Cleaning the surface and treating cracks and corners before application
- Checking the concrete floor and wall bases and identifying cracks
- Applying bitumen layers over the floor including the shower area
From first contact to the finished job in Al Wannan
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Your request from Al Wannan comes to usCall or WhatsApp on one number, and we answer you ourselves.
Start from Al Wannan with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Your questions on bitumen bathroom waterproofing in Al Wannan
Does bitumen protect against water seeping from the bathroom to an adjacent room?
Yes, bitumen prevents water from seeping through the floor below. But it must be applied correctly to joints and corners, and photos show the current condition and help us protect weak areas.
Can a bathroom be waterproofed with bitumen before it is rebuilt from scratch?
Yes, that is the best time for preventive waterproofing. Send us photos of the current bathroom and new building plans if available, so we can help you choose the right stage to apply bitumen.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
How do I request bitumen bathroom waterproofing in Al Wannan?
Call us, or send clear photos of the spot and its location in Al Wannan on WhatsApp, and we will work out the next step with you.
Bitumen bathroom waterproofing near Al Wannan
Nearby areas we also cover: Rizhan, Az Zughayn and As Sarrar.
More services in Al Wannan




