Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Wannan

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Wannan

Bathroom waterproofing before tiling in Al Wannan starts with a WhatsApp message containing photos of the floor and wet walls. The village has houses and villas of varying sizes, and nearly every bathroom needs a continuous waterproof barrier before tiles are laid to stop moisture damage.

Al Wannan homes have both traditional and modern designs, and their bathrooms vary in size and layout. Floors and walls around showers and sinks face constant moisture, and old mortar and tiles allow water to penetrate to lower layers. Waterproofing before tiling prevents this seepage and protects structures from moisture damage. Your photos show the condition clearly and we work with you to choose the right waterproof method before tiling starts.

  • Al Wannan is a village in the Eastern Province, close to Rizhan, Az Zughayn and As Sarrar, with houses and villas of small to medium size.
  • A bathroom in a village house faces high moisture from concentrated daily use, and a continuous waterproof layer is essential before any tiles are set.
What the service includes

The scope of the work in Al Wannan

  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Forming and treating the floor-to-wall corners before the main layer
  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

This is how we work in Al Wannan

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Bathroom waterproofing before tiling in Al WannanWe choose the method and the materials once we know the condition of the spot.

Al Wannan is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bathroom waterproofing before tiling in Al Wannan

Is waterproofing before tiling necessary for every bathroom in Al Wannan?

Yes, bathroom moisture is very high and water seeps easily into walls and floors. A continuous waterproof barrier protects the structure from long-term damage. Send bathroom photos so we can assess the situation.

What happens if the bathroom is not waterproofed before tiling?

Water penetrates beneath the tiles and dampens the concrete and walls inside, causing cracks, crumbling, dampness and mould later. Fixing it afterwards is more complex and costly.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Do you offer bathroom waterproofing before tiling in Al Wannan?

Yes. Al Wannan is within our service area in the Eastern Province, and we also work in Rizhan, Az Zughayn and As Sarrar. Call us or send photos of the spot on WhatsApp.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

Does the surface need to be completely dry before the membrane is applied?

Sufficient dryness is needed for good adhesion. Some materials tolerate a slightly damp surface while others need it fully dry. The surface is checked before work starts, and if visible moisture is present it is left long enough before the membrane is applied. We make this clear when the job is agreed.

Nearby areas

Areas near Al Wannan

If the site is outside Al Wannan, the same service is available in Rizhan, Az Zughayn and As Sarrar.

Other services in the area

More services in Al Wannan

Worker applying the white insulation layer on a villa roof by the sea

We start with you in Al Wannan
with one call

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp