Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Qusaybi

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Qusaybi

Bitumen bathroom waterproofing in Al Qusaybi starts with photos of the floor and walls sent by call or WhatsApp. The village has scattered houses and villas where bathrooms need protection before screed and tiles are laid. Bitumen creates a moisture barrier under the floor and lower walls.

In Al Qusaybi, buildings are spread out and bathrooms are often newly built or being renovated. Fresh concrete floors absorb moisture from running water and spray, and lower walls against the ground face dampness from inside and out. Bitumen is applied after the concrete is cleaned and levelled, before screed is poured or tiles are laid. Photos show the surface condition and the area to be treated.

  • Al Qusaybi is a village in the Eastern Province, close to Al Hunayy and Khurays, with scattered houses and villas.
  • An unprotected bathroom before tiling allows moisture to seep behind panels and floors after time.
What the service includes

The scope of the work in Al Qusaybi

  • Checking the concrete floor and wall bases and identifying cracks
  • Closing the waterproofing around drain openings and pipe entries
  • Cleaning the surface and treating cracks and corners before application
  • Confirming full drying before the screed is poured
How we work

The steps of bitumen bathroom waterproofing in Al Qusaybi

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Your request from Al Qusaybi comes to usCall or WhatsApp on one number, and we answer you ourselves.

Al Qusaybi is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bitumen bathroom waterproofing in Al Qusaybi

When in the building process is bitumen applied to a bathroom?

After the raw concrete is finished and cleaned well, and before screed is poured or tiles are laid. This ensures full protection of the floor and lower walls from water.

Does a bathroom in Al Qusaybi need special prep before bitumen is applied?

Yes, the surface must be clean, dry and free of dust and large cracks. Send photos so we can assess the concrete and advise you on what is needed before application.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

What should I send you from Al Qusaybi?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Qusaybi, and we will work out the next step with you.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Nearby areas

Bitumen bathroom waterproofing near Al Qusaybi

We also work near Al Qusaybi, in Al Hunayy, Khurays and At Tuhaymiyah.

Other services in the area

More services in Al Qusaybi

Pool at night with water jets after waterproofing

In Al Qusaybi and need bitumen bathroom waterproofing?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp