
Bitumen bathroom waterproofing in At Tuhaymiyah
Bitumen bathroom waterproofing in At Tuhaymiyah starts with photos and a call or WhatsApp message. The villas and small dwellings here need their floor bases and wall foundations protected before screed and tiles are laid, to prevent water seeping below.
At Tuhaymiyah is made up of houses and villas on medium plots, where bathrooms are usually built to varied local designs. Floor levels and joins between the bathroom and neighbouring spaces differ, meaning that how and how thick the lining is applied depends on the photo and details you describe. Bitumen protects the concrete from water before screed is poured, and the earlier we start the easier it is to apply before the final finishes.
- At Tuhaymiyah is a hamlet in the Eastern Province, close to Al Uthmaniyah, Udhailiyah and Imam Muhammed Ibn Saud Islamic University District.
- A villa bathroom in a hamlet may sit on the ground directly or on a base prone to damp, so a strong waterproof layer is essential.
What the service covers in At Tuhaymiyah
- Confirming full drying before the screed is poured
- Closing the waterproofing around drain openings and pipe entries
- Cleaning the surface and treating cracks and corners before application
- Checking the concrete floor and wall bases and identifying cracks
The stages of the work in At Tuhaymiyah
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.
Start from At Tuhaymiyah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
At Tuhaymiyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
Your questions on bitumen bathroom waterproofing in At Tuhaymiyah
Must the bathroom be waterproofed before the walls are built in At Tuhaymiyah?
No, bitumen is applied to the floor and wall base after the concrete is poured and dry, just before screed and tile are laid. Send a photo of the bathroom so we can see what stage of building you have reached.
Is bitumen alone enough to stop damp in a bathroom with a low floor in At Tuhaymiyah?
Bitumen stops water from below, but if the floor is very low it may need extra drainage. Photos help us see the site and tell you whether special drainage is needed before we apply the waterproofer.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
Do you offer bitumen bathroom waterproofing in At Tuhaymiyah?
Yes. At Tuhaymiyah is within our service area in the Eastern Province, and we also work in Al Uthmaniyah, Udhailiyah and Imam Muhammed Ibn Saud Islamic University District. Call us or send photos of the spot on WhatsApp.
The same service in nearby areas
We also offer bitumen bathroom waterproofing in Al Uthmaniyah, Udhailiyah and Imam Muhammed Ibn Saud Islamic University District, among the closest areas to At Tuhaymiyah.
More services in At Tuhaymiyah




