Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Imam Muhammed Ibn Saud Islamic University District

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Imam Muhammed Ibn Saud Islamic University District

Bitumen bathroom waterproofing in Imam Muhammed Ibn Saud Islamic University District starts with a WhatsApp message containing photos of the bathroom and affected areas. The district has multiple residential and institutional buildings, where waterproofing needs vary by building type and use. We assess the situation from photos to choose the right waterproofing method.

The district's buildings vary between residential, administrative and educational types, each with different bathroom needs. Bathrooms in administrative and educational buildings face heavy use, raising damp levels, while residential ones may suffer from poor drainage. Bitumen provides full protection when applied at the thickness and extent suited to the type of use. Photos show us the problem's severity and existing damage so we can decide whether surface waterproofing alone is enough or extra repairs are needed.

  • Imam Muhammed Ibn Saud Islamic University District is an area in the Eastern Province, near Al Badriyah District, Al Matar District and Al Quds District, with residential, administrative and educational buildings.
  • Bathrooms in educational and administrative buildings sustain heavy daily use, so the bitumen must be thick enough to withstand constant pressure from water and damp.
What the service includes

The scope of the work in Imam Muhammed Ibn Saud Islamic University District

  • Checking the concrete floor and wall bases and identifying cracks
  • Closing the waterproofing around drain openings and pipe entries
  • Applying bitumen layers over the floor including the shower area
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

This is how we work in Imam Muhammed Ibn Saud Islamic University District

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

We serve Imam Muhammed Ibn Saud Islamic University District and around itIncluding Al Badriyah District, Al Matar District and Al Quds District, as part of our work across the Eastern Province.

Your request from Imam Muhammed Ibn Saud Islamic University District comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Imam Muhammed Ibn Saud Islamic University District

Is bathroom waterproofing in educational buildings different from residential ones?

Yes, educational buildings see heavier bathroom use, so we need stronger and thicker waterproofing. Photos help us understand the use and pressure on the bathroom before deciding the waterproofing method.

Can a shared bathroom in an administrative building be waterproofed without stopping work?

In most cases we need to close the bathroom to waterproof it properly, especially if the leak is severe or we need to remove tiles. We can work out a schedule with you when you call or send the initial photos.

Do you cover Imam Muhammed Ibn Saud Islamic University District?

Yes. We serve Imam Muhammed Ibn Saud Islamic University District and nearby areas such as Al Badriyah District, Al Matar District and Al Quds District, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Nearby areas

Areas near Imam Muhammed Ibn Saud Islamic University District

Nearby areas we also cover: Al Badriyah District, Al Matar District and Al Quds District.

Other services in the area

More services in Imam Muhammed Ibn Saud Islamic University District

Pool at night with water jets after waterproofing

Tell us about your site in Imam Muhammed Ibn Saud Islamic University District
and we will plan the next step with you

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp