Bitumen bathroom waterproofing in Khurays
Bitumen bathroom waterproofing in Khurays covers floors and wall bases before the screed and tiles go down. Begin with photos of the bathroom sent by call or WhatsApp, including the floor edges and the drain, so we can agree the method with you before any work is planned.
Khurays is a town of houses on individual plots and some multi-storey family buildings. Many homes have bathrooms on the ground floor and others on upper floors above living areas, and the upper-floor ones need particular care at the slab and the drain. A bathroom against an outside wall can see its joint open up over time. Owners often notice damp at the skirting first, so a small wall photo beside the floor is helpful. The final choice depends on the building and what the photos show.
- Khurays is a town in the Eastern Province, close to Al Qusaybi, Al Hunayy and Judah.
- A bathroom against an outside wall is where water tests the wall base joint more than anywhere else.
The scope of the work in Khurays
- Confirming full drying before the screed is poured
- Cleaning the surface and treating cracks and corners before application
- Closing the waterproofing around drain openings and pipe entries
- Turning the layer up the walls in the wet zone and sealing the corners
The stages of the work in Khurays
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Bitumen bathroom waterproofing in KhuraysWe choose the method and the materials once we know the condition of the spot.
Your request from Khurays comes to usCall or WhatsApp on one number, and we answer you ourselves.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Your questions on bitumen bathroom waterproofing in Khurays
Is an upper-floor bathroom in Khurays suitable for bitumen?
Often yes, provided the slab below is sound and the drain outlet and falls can be reached. Photos of the floor and the ceiling beneath help us judge whether the layer can be laid properly before screed.
Should the outside wall be checked during bathroom waterproofing?
Yes, because the joint where an outside wall meets the floor is a common route for water. Send a photo of that corner and tell us whether damp shows on the inside face, so we can plan the wall bases with the floor.
Do you offer bitumen bathroom waterproofing in Khurays?
Yes. Khurays is within our service area in the Eastern Province, and we also work in Al Qusaybi, Al Hunayy and Judah. Call us or send photos of the spot on WhatsApp.
Is bitumen right for bathroom walls as well as the floor?
Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.