
Bitumen bathroom waterproofing in Al Majidiyah
Bitumen bathroom waterproofing in Al Majidiyah starts with photos of the floor and walls sent by call or WhatsApp. The district has villas and apartment blocks, where the bathroom needs protection before tiling. Bitumen forms a barrier layer to prevent moisture reaching the concrete and walls.
Bathrooms in Al Majidiyah vary by building age and design, from new villas to older apartment blocks. The concrete floor and walls face daily water exposure from showers and washing, and moisture can appear in adjoining rooms without a waterproofing layer before tiling. Bitumen is applied to a clean, dry surface before the ceramics to ensure lasting protection against water seepage and damp. Photos show the surface and wall condition so we can plan the application method with you.
- Al Majidiyah is a district in the Eastern Province, close to the Warehouse Area, Al Aqiq and Al Khamisah, with a mix of villas and residential apartment blocks.
- Every home's bathroom faces constant moisture, and bitumen protects the surface from saturation and damage beneath the tiles.
The main items of bitumen bathroom waterproofing in Al Majidiyah
- Confirming full drying before the screed is poured
- Checking the concrete floor and wall bases and identifying cracks
- Cleaning the surface and treating cracks and corners before application
- Closing the waterproofing around drain openings and pipe entries
The steps of bitumen bathroom waterproofing in Al Majidiyah
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.
Al Majidiyah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
We serve Al Majidiyah and around itIncluding Warehouse Area, Al Aqiq (near Inak) and Al Khamisah, as part of our work across the Eastern Province.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Questions about bitumen bathroom waterproofing in Al Majidiyah
When is bitumen applied in a bathroom in Al Majidiyah?
Bitumen is applied after the surface is cleaned and any concrete defects are repaired, then directly before tiling or flooring. The floor and walls must be completely dry before application.
Is bitumen alone enough to waterproof an older bathroom?
It depends on the concrete condition and existing cracks. If there are deep cracks or active leaks, we may need to treat them first. Photos help us decide whether bitumen alone is sufficient or additional steps are needed.
What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?
Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
Do you cover Al Majidiyah?
Yes. We serve Al Majidiyah and nearby areas such as Warehouse Area, Al Aqiq (near Inak) and Al Khamisah, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
The same service in nearby areas
Nearby areas we also cover: Warehouse Area, Al Aqiq (near Inak) and Al Khamisah.
More services in Al Majidiyah




