Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Aqiq (near Inak)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Aqiq (near Inak)

We waterproof bathrooms in Al Aqiq with bitumen, applied before screed and tiling, and we serve the district when you call or send photos on WhatsApp. The district lies near Al Mahar, the Warehouse Area and Al Majidiyah, and bathroom floors there vary with the age of the building.

The district's houses are villas and mid-sized residential buildings, and a bathroom often sits above another room. Damp usually shows at the floor base and lower walls after some years, so bitumen treats the separating layer before screed goes down. The photos show whether the existing floor needs removing or can be lined over.

  • Al Aqiq is a district of Dhahran in the Eastern Province, close to Al Mahar, the Warehouse Area and Al Majidiyah.
  • Damp rises at the wall base where bitumen meets screed, so that joint is treated before tiling.
What the service includes

The scope of the work in Al Aqiq (near Inak)

  • Checking the concrete floor and wall bases and identifying cracks
  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
  • Applying bitumen layers over the floor including the shower area
How we work

How we carry out bitumen bathroom waterproofing in Al Aqiq (near Inak)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Your request from Al Aqiq (near Inak) comes to usCall or WhatsApp on one number, and we answer you ourselves.

Bitumen bathroom waterproofing in Al Aqiq (near Inak)We choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in Al Aqiq (near Inak)

Can an upper-floor bathroom in Al Aqiq be waterproofed with bitumen?

Yes, if the concrete beneath is sound. We check the floor and joints from the photos first, then decide whether lining is enough or part of the screed must come out.

Is bitumen applied before tiling in Al Aqiq homes?

It is applied before screed and tiling in suitable cases, since the layer stays under the floor and protects the base joint. The exact sequence depends on the bathroom condition shown in the photos.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

How do I request bitumen bathroom waterproofing in Al Aqiq (near Inak)?

Call us, or send clear photos of the spot and its location in Al Aqiq (near Inak) on WhatsApp, and we will work out the next step with you.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

Bitumen bathroom waterproofing near Al Aqiq (near Inak)

We also work near Al Aqiq (near Inak), in Al Mahar, Warehouse Area and Al Majidiyah.

Other services in the area

More services in Al Aqiq (near Inak)

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Al Aqiq (near Inak)?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp