
Bitumen bathroom waterproofing in Al Mahar
Bitumen bathroom waterproofing in Al Mahar starts with photos of the floor and wall bases, sent by call or WhatsApp. The district has villas and houses with several bathrooms, and the floor is treated before the screed and tiling go down.
Al Mahar is made up mostly of villas and mid-sized houses, and its bathrooms usually have concrete floors under tiling. Damp tends to appear first at the joint between floor and wall and around the drain after several years of use. Bitumen goes onto the floor and wall bases before the screed, and the exact type depends on the base as the photos show it.
- Al Mahar is a residential district in Dammam in the Eastern Province, close to Inak, Al Bustan One and Al Aqiq.
- Water most often escapes at the floor-to-wall joint rather than through the middle of the tiles.
The scope of the work in Al Mahar
- Turning the layer up the walls in the wet zone and sealing the corners
- Applying bitumen layers over the floor including the shower area
- Confirming full drying before the screed is poured
- Closing the waterproofing around drain openings and pipe entries
From first contact to the finished job in Al Mahar
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.
Bitumen bathroom waterproofing in Al MaharWe choose the method and the materials once we know the condition of the spot.
Start from Al Mahar with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
Your questions on bitumen bathroom waterproofing in Al Mahar
Can an old bathroom in Al Mahar be waterproofed without breaking the tiles?
It depends on the tiles and the floor beneath. If the floor is sound and the damp shows at the joints, treatment from exposed areas may be enough, and the photos will show which option suits.
What decides the waterproofing method in Al Mahar villas?
It is set by the condition of the concrete under the tiling, the number of bathrooms and where the drains sit. We review these points from the photos before suggesting any method.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
Is bitumen right for bathroom walls as well as the floor?
Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.
Do you offer bitumen bathroom waterproofing in Al Mahar?
Yes. Al Mahar is within our service area in the Eastern Province, and we also work in Inak, Al Bustan One and Al Aqiq (near Inak). Call us or send photos of the spot on WhatsApp.
Does the bathroom need ventilation while bitumen is applied?
Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.
We also offer it in neighbouring areas
If the site is outside Al Mahar, the same service is available in Inak, Al Bustan One and Al Aqiq (near Inak).
More services in Al Mahar




