Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Bustan One

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Bustan One

Bitumen bathroom waterproofing in Al Bustan One starts with photos of the floor, walls and corners sent by call or WhatsApp. The district has villas and residential apartment blocks with bathrooms of varying age and concrete condition. Bitumen provides effective protection from moisture before tiling.

Bathrooms in Al Bustan One are found in homes of different ages, each needing protection before tiling. Concrete floors and walls absorb water easily without protection, causing damage to nearby tiles and paint. Applying bitumen to a clean, dry surface ensures sound waterproofing that stops moisture reaching the layers below. We will ask for clear photos around pipes and corners for a thorough assessment.

  • Al Bustan One is a district in the Eastern Province, close to Al Badr, Inak and Al Mahar, with varied villas and residential apartment blocks.
  • In a bathroom, water reaches the walls and floor daily, and bitumen forms a barrier preventing moisture seeping beneath the tiles.
What the service includes

What the service covers in Al Bustan One

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Checking the concrete floor and wall bases and identifying cracks
  • Confirming full drying before the screed is poured
  • Applying bitumen layers over the floor including the shower area
How we work

The stages of the work in Al Bustan One

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Al Bustan One is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Your request from Al Bustan One comes to usCall or WhatsApp on one number, and we answer you ourselves.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Common questions on bitumen bathroom waterproofing in Al Bustan One

Do cracks need repair before bitumen is applied?

Yes, cracks must be treated first to ensure a smooth, sound surface. We will review the photos and tell you what needs repair before bitumen is applied.

How long does bitumen take to dry?

It depends on the temperature and humidity in the bathroom. We will tell you the proper drying time after application so you can proceed with tiling.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Is Al Bustan One within your service area?

Yes, Al Bustan One is one of the areas we work in, as are Al Badr, Inak and Al Mahar. To start, call us or message us on WhatsApp.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Nearby areas

Areas near Al Bustan One

We also work near Al Bustan One, in Al Badr, Inak and Al Mahar.

Other services in the area

More services in Al Bustan One

Pool at night with water jets after waterproofing

In Al Bustan One and need bitumen bathroom waterproofing?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp