Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Badr

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Badr

Bitumen bathroom waterproofing in Al Badr begins with a message or photos of the current floor, sent via WhatsApp. The district has villas and small buildings, their bathrooms suffering from damp and leaks because old sealant has worn. A new bitumen layer protects the concrete structure and stops water entering lower floors and walls.

Al Badr has villas and small buildings of varying ages. In older villas, bathrooms often lack upkeep, the bitumen under tiles has deteriorated and water leaks into foundations and walls. Newer bathrooms may need initial waterproofing before tiling. Bitumen degrades under constant water and steam, so it must be applied tightly before mortar and tiles. Photos show whether leaking is surface or deep, helping choose the right method.

  • Al Badr is a district in the Eastern Province, near Al Bustan One, Inak and Qurtubah, with villas and small buildings.
  • An unrepaired bathroom leak reaches walls and ceilings below, causing structural damage over time.
What the service includes

The bitumen bathroom waterproofing work in Al Badr

  • Turning the layer up the walls in the wet zone and sealing the corners
  • Cleaning the surface and treating cracks and corners before application
  • Checking the concrete floor and wall bases and identifying cracks
  • Confirming full drying before the screed is poured
How we work

How we carry out bitumen bathroom waterproofing in Al Badr

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Your request from Al Badr comes to usCall or WhatsApp on one number, and we answer you ourselves.

Bitumen bathroom waterproofing in Al BadrWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Al Badr

Must old tiles in Al Badr be broken to apply new bitumen?

If leaking is minor and tiles are sound, we may treat the problem locally; if leaking is widespread, removing tiles, mortar and old sealant is needed before new bitumen. Send photos so we can tell you.

How long does it take to waterproof a bathroom in Al Badr after cleaning?

It depends on bathroom size and surface condition. We do not name a set time as work varies case by case, but we tell you details after seeing photos and the site.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Do you cover Al Badr?

Yes. We serve Al Badr and nearby areas such as Al Bustan One, Inak and Qurtubah (near Inak), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Nearby areas

Areas near Al Badr

Nearby areas we also cover: Al Bustan One, Inak and Qurtubah (near Inak).

Other services in the area

More services in Al Badr

Pool at night with water jets after waterproofing

We start with you in Al Badr
with one call

Describe the problem and where it is in Al Badr, and we will tell you the right next step.

+966 54 311 2066
Call nowWhatsApp