Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Qurtubah (near Inak)

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Qurtubah (near Inak)

We bitumen-waterproof bathrooms in Qurtubah before screed and tiling, and serve the district by call or WhatsApp with photos. The district is close to Al Naseem, At Tif and Al Khisab, with a mix of apartments and small villas.

Qurtubah has apartments in mid-rise buildings alongside small villas, and bathrooms in flats sometimes share a wall with a neighbour's. Trouble usually starts where the floor meets the wall, letting damp reach the floor below. Bitumen seals that zone before screed, and the photos show its extent in your case.

  • Qurtubah is a district of Dhahran in the Eastern Province, near Al Naseem, At Tif and Al Khisab.
  • In bathrooms sharing a wall, damp can pass through to the other side, so the floor-wall junction needs careful treatment.
What the service includes

The bitumen bathroom waterproofing work in Qurtubah (near Inak)

  • Closing the waterproofing around drain openings and pipe entries
  • Checking the concrete floor and wall bases and identifying cracks
  • Cleaning the surface and treating cracks and corners before application
  • Confirming full drying before the screed is poured
How we work

From first contact to the finished job in Qurtubah (near Inak)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

We serve Qurtubah (near Inak) and around itIncluding Al Naseem, At Tif and Al Khisab, as part of our work across the Eastern Province.

Qurtubah (near Inak) is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب

Google review · Dec 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

Your questions on bitumen bathroom waterproofing in Qurtubah (near Inak)

Can a flat bathroom in Qurtubah be waterproofed without affecting the neighbour?

The work is limited to the bathroom itself, and the photos show whether the shared wall needs extra treatment. We tell you before starting so nothing comes as a surprise.

Is bitumen used for a small villa bathroom in Qurtubah?

Yes, particularly at the old floor and the base of the walls. The photos decide whether lining is enough or part of the screed must be broken out.

Do you cover Qurtubah (near Inak)?

Yes. We serve Qurtubah (near Inak) and nearby areas such as Al Naseem, At Tif and Al Khisab, from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

The same service in nearby areas

If the site is outside Qurtubah (near Inak), the same service is available in Al Naseem, At Tif and Al Khisab.

Other services in the area

More services in Qurtubah (near Inak)

Pool at night with water jets after waterproofing

Tell us about your site in Qurtubah (near Inak)
and we will plan the next step with you

Call us or send photos of the floor, the pipe entries and the wall bases on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp