Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Khamisah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Khamisah

Bitumen bathroom waterproofing in Al Khamisah begins with WhatsApp photos or a phone call. The district is residential with villas and homes, and their bathrooms need moisture protection before tiles and screed are installed.

Al Khamisah has villas and homes of varying ages and sizes, some newly renovated and some original. An old bathroom may have mould or leaks in joints and corners, while a new one needs solid bitumen lining before construction. Intense heat and humidity affect materials, and photos show if there is dampness from under the floor or adjacent walls.

  • Al Khamisah is a district in the Eastern Province, near Al Jazirah, Ar Rabiah and Al Wadiah, with residential homes.
  • A bathroom floor exposed to daily steam and water spills needs tight bitumen layers to prevent water seeping into the base.
What the service includes

The main items of bitumen bathroom waterproofing in Al Khamisah

  • Closing the waterproofing around drain openings and pipe entries
  • Checking the concrete floor and wall bases and identifying cracks
  • Applying bitumen layers over the floor including the shower area
  • Turning the layer up the walls in the wet zone and sealing the corners
How we work

This is how we work in Al Khamisah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Your request from Al Khamisah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Bitumen bathroom waterproofing in Al KhamisahWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Al Khamisah

Is bitumen visible under tiles or completely hidden?

Bitumen goes under tiles and screed, so it is completely invisible. Its role is to protect the base and walls from water without affecting the bathroom's final appearance.

Does a bathroom need to dry for a long time after bitumen before finishing?

Yes, there is a drying time that depends on the material and weather. Initial photos and assessment help us estimate the right time before we start work.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

What is the difference between a bitumen coating and bitumen roll membrane in a bathroom?

Liquid bitumen is brushed or rolled on and reaches tight corners easily. Bitumen roll membrane is bonded to the surface by heat or adhesive and gives a firmer layer. The choice between the two depends on the floor condition, the size of the bathroom and how much water it sees. Send photos and we will advise.

Is Al Khamisah within your service area?

Yes, Al Khamisah is one of the areas we work in, as are Al Jazirah, Ar Rabiah and Al Wadiah. To start, call us or message us on WhatsApp.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Nearby areas

Areas near Al Khamisah

If the site is outside Al Khamisah, the same service is available in Al Jazirah, Ar Rabiah and Al Wadiah.

Other services in the area

More services in Al Khamisah

Pool at night with water jets after waterproofing

Bitumen bathroom waterproofing in Al Khamisah?
Call us now

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp