Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Jazirah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Jazirah

We apply bitumen bathroom waterproofing in Al Jazirah, Al-Ahsa, beginning with photos of the floor and wall bases sent by call or WhatsApp. Bitumen goes on before the screed and tiles to protect the inner layers from seeping water.

Al Jazirah is largely private and mid-sized homes built close together, and many of its bathrooms were constructed in a traditional way without a clear waterproofing layer. Damp therefore shows up on lower walls and corners after some years, and an older bathroom may need more preparation before application. The photos will show the state of the floor and whether the lining alone will be enough.

  • Al Jazirah is a residential district of Al-Ahsa in the Eastern Province, near Al Wadiah, Al Khamisah and Kuwaikib.
  • Traditional bathrooms often lack a clear waterproofing layer under the tiles, so seepage appears after a period of use.
What the service includes

The scope of the work in Al Jazirah

  • Confirming full drying before the screed is poured
  • Cleaning the surface and treating cracks and corners before application
  • Closing the waterproofing around drain openings and pipe entries
  • Applying bitumen layers over the floor including the shower area
How we work

The stages of the work in Al Jazirah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.

Your request from Al Jazirah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Start from Al Jazirah with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Jazirah

Is bitumen suitable for older homes' bathrooms in Al Jazirah?

It often is, but bathrooms never previously waterproofed usually need more preparation; the photos will show whether direct application is enough.

Will lower-wall damp remain after bathroom lining in Al Jazirah?

Lining stops water entering through the floor and corners, but old damp trapped in the wall is treated first where present; the photos will reveal this.

What should I send you from Al Jazirah?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Jazirah, and we will work out the next step with you.

Does the bathroom need ventilation while bitumen is applied?

Yes. Bitumen gives off fumes during application and while it dries. Windows and doors should be open and any extraction fan running to bring in fresh air. This is why the neighbouring space should be cleared during the work and until the coating has hardened.

Is bitumen right for bathroom walls as well as the floor?

Bitumen is applied to the floor and turned up the walls in the wet area, especially along the lower part of the walls around the shower zone. For the upper part of the walls a different membrane type may be preferred depending on the finish required.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

The same service in nearby areas

We also work near Al Jazirah, in Al Wadiah, Al Khamisah and Kuwaikib.

Other services in the area

More services in Al Jazirah

Pool at night with water jets after waterproofing

We start with you in Al Jazirah
with one call

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp