Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Lisafah

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Lisafah

We waterproof bathroom floors and wall bases in Al Lisafah with bitumen, applied before the screed and tiling go down, starting from photos sent by call or WhatsApp. The method is chosen once we have seen the floor, the walls and their surroundings.

The villages here hold standalone houses of varied age, and bathrooms there are often added to an existing building later. That makes the wall base and the floor-to-wall joint the points most open to seepage. We treat those points before screeding, and the photos show the condition of each bathroom separately.

  • Al Lisafah is a village in the Eastern Province, close to Umm ash Shifallah, Al Qara' and Al Hayra.
  • Moisture often seeps in at the wall base before it shows on the floor surface.
What the service includes

What the service covers in Al Lisafah

  • Closing the waterproofing around drain openings and pipe entries
  • Confirming full drying before the screed is poured
  • Cleaning the surface and treating cracks and corners before application
  • Checking the concrete floor and wall bases and identifying cracks
How we work

From first contact to the finished job in Al Lisafah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Al Lisafah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Bitumen bathroom waterproofing in Al LisafahWe choose the method and the materials once we know the condition of the spot.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Al Lisafah

Does a bathroom in Al Lisafah need waterproofing before tiling?

It is advisable in most cases, since bitumen goes under the screed and protects the concrete from water that seeps through. The photos will show whether your current floor needs it.

What should I send to assess a bathroom in Al Lisafah?

Send photos of the floor, the wall bases and any damp patches or cracks, and tell us whether the bathroom is old or new. With that we can see what is needed before any decision.

How do I request bitumen bathroom waterproofing in Al Lisafah?

Call us, or send clear photos of the spot and its location in Al Lisafah on WhatsApp, and we will work out the next step with you.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

Nearby areas

Areas near Al Lisafah

We also work near Al Lisafah, in Umm ash Shifallah, Al Qara' and Al Hayra.

Other services in the area

More services in Al Lisafah

Pool at night with water jets after waterproofing

We start with you in Al Lisafah
with one call

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp