Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Lisafah

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Lisafah

We waterproof bathrooms in the village of Al Lisafah before tiling, with a continuous membrane across the floor and the walls exposed to water. Start by sending photos of the bathroom by call or WhatsApp, and we will settle the work with you from there.

The village has detached houses and family homes set apart from one another, many built in stages, so floor and wall build-ups differ from one bathroom to the next. An older concrete floor may show fine cracks at its joints, and those need treating before the membrane goes on. Because humidity in the Eastern Province can keep interior walls damp at times, the photos and the current condition of the room help decide the right approach.

  • Al Lisafah is a village in the Al-Ahsa governorate of the Eastern Province, lying close to Umm ash Shifallah, Al Qara' and Al Hayra.
  • Older floors with many joints usually need their cracks treated before any membrane goes down.
What the service includes

What the service covers in Al Lisafah

  • Checking the floor, the render, the corners, the drain outlet and pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

This is how we work in Al Lisafah

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

Your request from Al Lisafah comes to usCall or WhatsApp on one number, and we answer you ourselves.

Al Lisafah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Talk to us directlyCall or WhatsApp on the same number.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Questions about bathroom waterproofing before tiling in Al Lisafah

Can an old bathroom in Al Lisafah be waterproofed without breaking up the floor?

In many cases yes, if the concrete base is sound and can take a new layer. The photos show whether demolition is needed before we suggest any step.

Do you waterproof bathrooms in detached houses in Al Lisafah?

Yes, we serve Al Lisafah. Send photos of the bathroom and the walls around the shower, and we will agree the work with you before tiling.

What decides the cost of waterproofing a bathroom before tiling?

The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.

Is Al Lisafah within your service area?

Yes, Al Lisafah is one of the areas we work in, as are Umm ash Shifallah, Al Qara' and Al Hayra. To start, call us or message us on WhatsApp.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Can the membrane go straight over the render?

It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.

Nearby areas

We also offer it in neighbouring areas

Nearby areas we also cover: Umm ash Shifallah, Al Qara' and Al Hayra.

Other services in the area

More services in Al Lisafah

Worker applying the white insulation layer on a villa roof by the sea

Your first step in Al Lisafah:
a call or a WhatsApp message

Call us or send photos of the bathroom and the floor on WhatsApp, and we take it from there.

+966 54 311 2066
Call nowWhatsApp