
Bathroom waterproofing before tiling in Al Lisafah
We waterproof bathrooms in the village of Al Lisafah before tiling, with a continuous membrane across the floor and the walls exposed to water. Start by sending photos of the bathroom by call or WhatsApp, and we will settle the work with you from there.
The village has detached houses and family homes set apart from one another, many built in stages, so floor and wall build-ups differ from one bathroom to the next. An older concrete floor may show fine cracks at its joints, and those need treating before the membrane goes on. Because humidity in the Eastern Province can keep interior walls damp at times, the photos and the current condition of the room help decide the right approach.
- Al Lisafah is a village in the Al-Ahsa governorate of the Eastern Province, lying close to Umm ash Shifallah, Al Qara' and Al Hayra.
- Older floors with many joints usually need their cracks treated before any membrane goes down.
What the service covers in Al Lisafah
- Checking the floor, the render, the corners, the drain outlet and pipe sleeves
- Applying the membrane over the full floor and up the walls in the wet zone
- Sealing around the drain outlet, the door threshold and all pipe sleeves
- Cleaning the surface, removing loose parts and treating hairline cracks
This is how we work in Al Lisafah
Send photos of the bathroom
On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.
Prepare the surface
The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.
Apply the membrane
The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.
Dry, then tiling begins
The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.
Why Abraj Al Azl?
Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.
Your request from Al Lisafah comes to usCall or WhatsApp on one number, and we answer you ourselves.
Al Lisafah is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
Real Google reviews, shown exactly as their authors wrote them.
Questions about bathroom waterproofing before tiling in Al Lisafah
Can an old bathroom in Al Lisafah be waterproofed without breaking up the floor?
In many cases yes, if the concrete base is sound and can take a new layer. The photos show whether demolition is needed before we suggest any step.
Do you waterproof bathrooms in detached houses in Al Lisafah?
Yes, we serve Al Lisafah. Send photos of the bathroom and the walls around the shower, and we will agree the work with you before tiling.
What decides the cost of waterproofing a bathroom before tiling?
The floor area and how high the layer runs up the walls, the condition of the render, the number of cracks, corners and pipe sleeves, and the material that suits the surface. Send photos and rough dimensions on WhatsApp, tell us about the project, and we will explain the treatment needed.
Is Al Lisafah within your service area?
Yes, Al Lisafah is one of the areas we work in, as are Umm ash Shifallah, Al Qara' and Al Hayra. To start, call us or message us on WhatsApp.
How high up the wall does the membrane go?
It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.
Can the membrane go straight over the render?
It can, if the render is firm, clean and free of loose parts and cracks. If the render is weak or hollow it is removed or treated first, because the waterproof layer cannot compensate for an unsound surface beneath it.
We also offer it in neighbouring areas
Nearby areas we also cover: Umm ash Shifallah, Al Qara' and Al Hayra.
More services in Al Lisafah



