Abraj Al AzlContracting
Call العربية
Black bitumen membrane laid on a floor around two pipe stubs

Bitumen bathroom waterproofing in Al Hayra

Bitumen beneath the tiles

Bitumen waterproofing for bathroom floors and wall bases, before screed and tiling

+966 54 311 2066
The service in your area

Bitumen bathroom waterproofing in Al Hayra

Bitumen bathroom waterproofing in Al Hayra starts with photos of the floor and walls, sent by call or WhatsApp. The village has scattered houses and villas, where the bathroom must be protected from damp before screed and tiling are laid.

Al Hayra's houses vary between older and newer buildings, with bathrooms of different designs and sizes. An older bathroom may show seepage beneath the tiles or dampness on adjacent walls, while a new one needs preventive waterproofing before construction. Daily water use exerts pressure on the structure, and bitumen forms a strong barrier layer beneath the screed. Photos show the floor condition and joints to choose the right application method.

  • Al Hayra is a village in the Eastern Province, close to Ibn Sharar, Al Lisafah and Manakh, with scattered houses, villas and small plots.
  • A bathroom in a house faces water and steam daily, so the base layer must protect the concrete from seepage below.
What the service includes

The scope of the work in Al Hayra

  • Cleaning the surface and treating cracks and corners before application
  • Confirming full drying before the screed is poured
  • Closing the waterproofing around drain openings and pipe entries
  • Applying bitumen layers over the floor including the shower area
How we work

This is how we work in Al Hayra

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.

2

Prepare the surface

The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.

3

Apply the bitumen

Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.

4

Screed, then tile

Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.

What sets us apart

Why Abraj Al Azl?

A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.

Al Hayra is in our service areaWe work there and across the Eastern Province, from our base in Al Uwaymiriyah, Hofuf.

Bitumen bathroom waterproofing in Al HayraWe choose the method and the materials once we know the condition of the spot.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Worker rolling the white insulation layer onto a roof
Two workers in high-visibility vests insulating a roof beside the AC units
Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing

Customer reviews

What our customers said

أفضل شركة عزل اسطح الفوم وخزانات المياه

Google review · Dec 2025

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

Real Google reviews, shown exactly as their authors wrote them.

Questions

Before you book bitumen bathroom waterproofing in Al Hayra

Is bitumen alone enough to waterproof the bathroom or do we need other layers?

Bitumen forms the primary barrier beneath screed and tiles, but preparing the floor and joints first matters. Photos will show if there are cracks or weak areas needing treatment before bitumen is applied.

When should a bathroom in an old Al Hayra house be waterproofed with bitumen?

If dampness appears on walls or seepage beneath tiles, it is time. But you can also waterproof preventively during renovation; send photos so we can assess the condition with you.

How do I know the bathroom was not properly waterproofed before?

Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.

What decides the cost of bitumen waterproofing for a bathroom?

The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.

What should I send you from Al Hayra?

Send clear photos of the spot and a short description of the problem on WhatsApp, mention that you are in Al Hayra, and we will work out the next step with you.

Why does bitumen need screed over it before tiling?

Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.

Nearby areas

The same service in nearby areas

We also offer bitumen bathroom waterproofing in Ibn Sharar, Al Lisafah and Manakh, among the closest areas to Al Hayra.

Other services in the area

More services in Al Hayra

Pool at night with water jets after waterproofing

In Al Hayra and need bitumen bathroom waterproofing?
Send us photos of the spot

One number for calls and WhatsApp, and you talk to us directly.

+966 54 311 2066
Call nowWhatsApp