
Bitumen bathroom waterproofing in Al Durra (near Ghunan)
Bitumen bathroom waterproofing in Al Durra begins with photos of the bathroom floor and wall bases, sent by call or on WhatsApp. The district lies close to the coast, where humid air can keep bathroom walls damp, so the wall bases deserve the same attention as the floor.
Al Durra has a mix of villas and apartment blocks, and many of its newer bathrooms sit on concrete slabs with floors prepared for wet use. In humid coastal air, rising damp at the base of a wall can show as darkening or peeling paint well before the tiles fail. Bitumen is applied before the screed, which makes it easier to cover the floor and wall bases in one run, and the photos show whether your bathroom needs it.
- Al Durra is a district in the Eastern Province, close to Al Aqiq, Half Moon Beach and Al Murjan, with villas and apartment blocks.
- Rising damp at the foot of a wall often shows as paint that bubbles or darkens above the skirting.
The bitumen bathroom waterproofing work in Al Durra (near Ghunan)
- Cleaning the surface and treating cracks and corners before application
- Checking the concrete floor and wall bases and identifying cracks
- Closing the waterproofing around drain openings and pipe entries
- Applying bitumen layers over the floor including the shower area
How we carry out bitumen bathroom waterproofing in Al Durra (near Ghunan)
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
A continuous barrier with no gapsBitumen covers corners, pipe entries and drain openings in one unbroken layer, leaving no exposed point.
Your request from Al Durra (near Ghunan) comes to usCall or WhatsApp on one number, and we answer you ourselves.
Bitumen bathroom waterproofing in Al Durra (near Ghunan)We choose the method and the materials once we know the condition of the spot.
We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.
Some of our work

















What our customers said
أفضل شركة عزل اسطح الفوم وخزانات المياه
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
ماشاء الله تبارك الرحمن عزل اسطح ممتاز
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Al Durra (near Ghunan)
Do you include the wall bases in bathroom bitumen work?
Yes, the wall bases are part of the same waterproofing run when they are damp or exposed to splashing. The photos show how far up the damp goes, which decides how much of the wall needs covering.
How do I start a bathroom waterproofing request in Al Durra?
Send photos of the floor, the wall bases and any staining by WhatsApp, or call us. Mention whether the bathroom sits on a slab or upstairs, since that changes how the floor is reached.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
Do you cover Al Durra (near Ghunan)?
Yes. We serve Al Durra (near Ghunan) and nearby areas such as Al Aqiq (near Dhahran), Half Moon Beach and Al Murjan (near Dhahran), from our base in Al Uwaymiriyah, Hofuf. Start with a call or a WhatsApp message.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
Bitumen bathroom waterproofing near Al Durra (near Ghunan)
We also offer bitumen bathroom waterproofing in Al Aqiq (near Dhahran), Half Moon Beach and Al Murjan (near Dhahran), among the closest areas to Al Durra (near Ghunan).
More services in Al Durra (near Ghunan)




