Abraj Al AzlContracting
Call العربية
Screeded bathroom with a continuous grey membrane up the wall base

Bathroom waterproofing before tiling in Al Durra (near Ghunan)

Waterproof before you tile

A continuous waterproof membrane on the bathroom floor and wet-area walls, before adhesive and tiles go on

+966 54 311 2066
The service in your area

Bathroom waterproofing before tiling in Al Durra (near Ghunan)

In Al Durra we waterproof bathrooms before tiling with a continuous membrane on the floor and wet-area walls, starting from photos sent by call or WhatsApp. We serve Al Durra in the Eastern Province and use the photos to confirm whether the bathroom needs the membrane redone before adhesive goes on.

Al Durra combines villas with relatively modern homes, and some bathrooms have large wet-showering areas. The many wet surfaces in newer bathrooms make the grout lines and drains sensitive, so the membrane must be tight. Its position near the coast means humid air keeps walls damp for longer, so these bathrooms need extra attention to ventilation and the membrane.

  • Al Durra is a residential district of Al Khobar in the Eastern Province, close to Al Aqiq, Half Moon Beach and Al Murjan.
  • Drains and grout lines are points where water gets through, so they need a tight membrane before tiling.
What the service includes

The bathroom waterproofing before tiling work in Al Durra (near Ghunan)

  • Forming and treating the floor-to-wall corners before the main layer
  • Sealing around the drain outlet, the door threshold and all pipe sleeves
  • Applying the membrane over the full floor and up the walls in the wet zone
  • Cleaning the surface, removing loose parts and treating hairline cracks
How we work

This is how we work in Al Durra (near Ghunan)

1

Send photos of the bathroom

On WhatsApp: photos of the floor, the walls, the drain outlet and the door threshold, so we can read the surface and decide the right material and treatment.

2

Prepare the surface

The floor and render are cleaned of dust and loose parts, hairline cracks, joints and corners are treated, and pipe sleeves and the drain outlet are sealed before anything else.

3

Apply the membrane

The layer covers the full floor, rises on the walls in the shower and basin area, is worked carefully into the corners and closes around the drain outlet and the door threshold. The material chosen depends on the surface and its condition.

4

Dry, then tiling begins

The membrane is left to dry and cure before tile adhesive and tiles go on, so it is not stressed or wetted from above before it is fully ready.

What sets us apart

Why Abraj Al Azl?

Corners and the drain get first attentionThe floor-to-wall corner and the area around the drain outlet are where most leaks begin, and these are treated carefully before the main layer goes on.

We serve Al Durra (near Ghunan) and around itIncluding Al Aqiq (near Dhahran), Half Moon Beach and Al Murjan (near Dhahran), as part of our work across the Eastern Province.

Start from Al Durra (near Ghunan) with one messageSend us photos of the spot on WhatsApp and we will work out the next step with you.

We reply 5 AM to 10 PMSaturday to Thursday, and Friday on its own hours.

Our work

Some of our work

Two workers on the roof insulating around an AC unit
Worker applying the white insulation layer on a villa roof by the sea
Villa roof finished in white insulation with a glass railing over the sea
Worker standing on an insulated roof beside a glass railing
White insulated dome on a roof among the houses
White stepped dome on an insulated roof above a street

Customer reviews

What our customers said

ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم

Google review · Nov 2024

اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم

Google review · Dec 2024

ماشاء الله تبارك الرحمن عزل اسطح ممتاز

Google review · Jun 2026

Real Google reviews, shown exactly as their authors wrote them.

Questions

What customers ask in Al Durra (near Ghunan)

Does a modern bathroom in Al Durra need waterproofing before tiling?

If the bathroom has a large shower area, a membrane is likely needed to stop water reaching the walls of neighbouring spaces. The photos show whether a full or partial membrane is required.

Does coastal humidity affect bathroom waterproofing in Al Durra?

Yes, humid air keeps walls wet for longer and the membrane may need good ventilation. We take this into account when choosing the method and explain what is needed after reviewing the photos.

Do you offer bathroom waterproofing before tiling in Al Durra (near Ghunan)?

Yes. Al Durra (near Ghunan) is within our service area in the Eastern Province, and we also work in Al Aqiq (near Dhahran), Half Moon Beach and Al Murjan (near Dhahran). Call us or send photos of the spot on WhatsApp.

How is the corner between the floor and the wall sealed?

The corner is the most vulnerable point because it joins two surfaces at a right angle. It is filled and formed with a suitable compound before the waterproof layer is turned up over it, so the layer stays continuous rather than cracking at the bend.

What is the difference between a cementitious coating and a liquid membrane in a bathroom?

The cementitious coating bonds firmly to the concrete slab and the wall and suits flat regular surfaces. The liquid membrane is brushed on and follows corners and detailed areas easily. The choice between them depends on the surface and the bathroom layout, and we decide after seeing the photos.

How high up the wall does the membrane go?

It depends on the bathroom layout and where the showerhead and basin sit. In the shower area the layer rises to cover the full wet zone, and at the other walls it turns up a safe distance above the floor. We set the height after seeing the photos and the layout.

Nearby areas

Bathroom waterproofing before tiling near Al Durra (near Ghunan)

We also work near Al Durra (near Ghunan), in Al Aqiq (near Dhahran), Half Moon Beach and Al Murjan (near Dhahran).

Other services in the area

More services in Al Durra (near Ghunan)

Worker applying the white insulation layer on a villa roof by the sea

In Al Durra (near Ghunan) and need bathroom waterproofing before tiling?
Send us photos of the spot

Call us, or send photos of the spot and a short description of the problem on WhatsApp.

+966 54 311 2066
Call nowWhatsApp