
Bitumen bathroom waterproofing in Al Murjan (near Dhahran)
Bitumen bathroom waterproofing in Al Murjan begins with photos of the floor and walls, sent by call or WhatsApp. The district has villas and apartment buildings close to the coast, where moisture and salt threaten bathrooms with leaks and damp.
Al Murjan is marked by its proximity to the coast, mixing villas and apartment buildings near Half Moon Beach. Coastal moisture penetrates foundations and leaves bathrooms vulnerable to leaks even in new structures. Concrete absorbs both salt and water, causing slow cracking and decay. Bitumen forms a lasting barrier against water and salt before screed and tiles go down. Photos show how much the walls and corners are affected by existing damp.
- Al Murjan is a district in the Eastern Province, close to Half Moon Beach, Al Loaloa and Al Kawthar, with residential buildings near the coast.
- Bathrooms in coastal buildings face high moisture and constant salt, and bitumen protects concrete from rapid decay and leakage.
The bitumen bathroom waterproofing work in Al Murjan (near Dhahran)
- Applying bitumen layers over the floor including the shower area
- Cleaning the surface and treating cracks and corners before application
- Confirming full drying before the screed is poured
- Closing the waterproofing around drain openings and pipe entries
How we carry out bitumen bathroom waterproofing in Al Murjan (near Dhahran)
Send photos of the bathroom
On WhatsApp: photos of the floor, the wall bases, the drain outlet and the pipe entries, so we can read the surface and set the scope of the work.
Prepare the surface
The floor is cleaned of dust and loose material, cracks and wall-base joints are treated, and the surface is prepared to receive the bitumen layer.
Apply the bitumen
Bitumen layers cover the floor, turn up at the walls and close tightly around the drain outlet, pipe entries and corners. The coating is left to dry and harden before any next step, and the room is kept ventilated during and after application.
Screed, then tile
Once the bitumen has fully dried, screed is poured over it to protect it, and the floor and walls can then be tiled over the screed without damaging the waterproofing.
Why Abraj Al Azl?
Protecting the concrete slabWater that reaches the reinforcement begins to damage it slowly. Early waterproofing stops that process before it starts.
Your request from Al Murjan (near Dhahran) comes to usCall or WhatsApp on one number, and we answer you ourselves.
We serve Al Murjan (near Dhahran) and around itIncluding Half Moon Beach, Al Loaloa (near Dhahran) and Al Kawthar (near Dhahran), as part of our work across the Eastern Province.
Talk to us directlyCall or WhatsApp on the same number.
Some of our work

















What our customers said
ماشاء الله عملهم للعزل والتسريبات ممتاز وخبره ودقه في العمل انصح بالتعامل معهم موفقين يارب
اتعاملت معاهم في العوازل عند كفيلي شغل يبيض الوجه انص التعامل معهم
أفضل شركة عزل اسطح الفوم وخزانات المياه
Real Google reviews, shown exactly as their authors wrote them.
What customers ask in Al Murjan (near Dhahran)
Does coastal humidity in Al Murjan make bitumen waterproofing insufficient for a bathroom?
Bitumen works effectively even in damp coastal areas. However, if exterior walls show moisture or salt staining, we may need extra steps around the foundation. Photos will clarify this and help us recommend correctly.
Should bathroom exterior walls in Al Murjan be waterproofed as well as the floor?
It depends on where the bathroom is in the building. If it has exterior walls facing the coast or showing moisture, yes, full protection is needed. Send photos showing the location so we can determine what is necessary.
What decides the cost of bitumen waterproofing for a bathroom?
The floor area and the height the layer turns up the walls, how many pipe entries and drain openings need sealing, the condition of the concrete floor, and whether cracks must be treated first. Send photos and rough dimensions on WhatsApp and we will explain what the work covers.
How do I know the bathroom was not properly waterproofed before?
Signs include damp on the ceiling of the room below, cracking render at the wall bases, tiles lifting at the floor edge or a persistent damp smell. All of these mean water has got through a layer under the tiles. Send us photos to identify where the problem starts.
Why does bitumen need screed over it before tiling?
Bitumen is a flexible layer and not firm enough to take tile adhesive directly. Screed protects it from puncture and pressure during and after tiling, and spreads the load over the waterproof layer so it stays intact.
Is Al Murjan (near Dhahran) within your service area?
Yes, Al Murjan (near Dhahran) is one of the areas we work in, as are Half Moon Beach, Al Loaloa (near Dhahran) and Al Kawthar (near Dhahran). To start, call us or message us on WhatsApp.
Areas near Al Murjan (near Dhahran)
If the site is outside Al Murjan (near Dhahran), the same service is available in Half Moon Beach, Al Loaloa (near Dhahran) and Al Kawthar (near Dhahran).
More services in Al Murjan (near Dhahran)




